BRULE SCHOOL · UNDER REVIEW

Business planning appendix

Course ideas, classroom proposals and basic outlines before full teaching.

Back to the programme blueprint

46 historical profiles. Not 46 new courses.

The recovered map contains 34 required profiles and 12 elective options for a proposed 40-course pathway. Shared courses are not counted again. Current teaching remains 24 offerings / 218 lessons in the verified source snapshot.

Four read-only planning studios are available on Business Level 3. Other future rooms remain proposed and unbuilt. This appendix does not enrol learners, track progress, assign teachers, or claim degrees, credit or accreditation. The 62 incoming ideas remain a separate review ledger; zero are confirmed net-new.

Economics identity unresolved: the old integrated profile does not replace newer separate Microeconomics 1000 and Macroeconomics 1001. Accounting, SQL and other reserved owner work is preserved. Historical prerequisite IDs are evidence, not adopted aliases.

46 planning profiles

Business Foundations: Customers, Value & ViabilityPlanned · required · source semester 1

Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

Proposed room: Business hall · B-PLAN-01 — not built or assigned.

Historical source ID: business-foundations (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand

Planned outline — not authored lessons

  • Customer roles and demand evidence
  • Alternatives and value promises
  • Segmentation and channels
  • Revenue mechanisms and connected models
  • Delivery capacity and relevant costs
  • Contribution, break-even and sensitivity
  • Profit and cash timing
  • Working capital and financial audit
  • Assumption tests and customer signals
  • Stakeholders and responsible offers
  • Comparison and feasibility dossier
  • Challenge, revision and delayed transfer

Intended outcomes

  • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
  • Compare alternatives and switching costs, then justify a bounded value promise for a specified segment
  • Connect channels, revenue mechanisms, delivery activity, resources and capacity in one internally consistent model
  • Calculate and interpret contribution, whole-unit break-even, capacity and changed-case sensitivity, including nonpositive contribution
  • Reconcile simplified operating profit with dated cash receipts, payments and working-capital changes under explicit assumptions
  • Challenge a consequential business assumption with a bounded ethical test and interpret conflicting signals without inventing validation
  • Produce, challenge and revise an integrated feasibility dossier supported by auditable calculations and a delayed transfer response

Prerequisites — historical references

None listed in this historical profile.

Corequisites — historical references

None listed in this historical profile.

Entry competencies

  • Read and annotate a short case; perform signed-number, fraction, percentage and unit calculations; preserve a local working file or paper record. Diagnose and remediate from existing shared short courses without adding course-count requirements.

Planned project

Original maximum-2,000-word feasibility recommendation plus calculation tables, a bounded test, an alternative and documented revision, using either supplied fictional service or product evidence pack. Preserve an unassisted attempt and a delayed transfer response. No actual business registration, purchase, real customer research or public advice.

Existing supporting teaching

Source limits

Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
Accounting FoundationsPlanned · required · source semester 1

Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge. Reserved Accounting/SQL owner work must not be duplicated or reassigned.

Proposed room: Business hall · B-PLAN-02 — not built or assigned.

Historical source ID: accounting-foundations (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Record a supplied transaction set using the accounting equation and double entry, with every journal entry balanced

Planned outline — not authored lessons

  • Classify entity, period and source documents
  • Use assets liabilities equity and the accounting equation
  • Record debits and credits for ordinary transactions
  • Post journals and reconcile a trial balance
  • Account for sales receivables and bad-debt estimates
  • Track purchases inventory and cost of sales
  • Reconcile bank cash and timing differences
  • Allocate accruals deferrals and depreciation
  • Prepare an income statement with stated assumptions
  • Link the financial-position and cash summaries
  • Investigate errors and design a small period-close checklist
  • Complete a new period close and explain revisions

Intended outcomes

  • Record a supplied transaction set using the accounting equation and double entry, with every journal entry balanced
  • Reconcile ledger balances to a trial balance and resolve a bank difference using an evidence trail
  • Produce linked introductory income, financial-position and cash summaries after justified period-end adjustments and explain cash-profit differences

Prerequisites — historical references

None listed in this historical profile.

Corequisites — historical references

None listed in this historical profile.

Entry competencies

  • Read and annotate a short case; perform signed-number, fraction, percentage and unit calculations; preserve a local working file or paper record. Diagnose and remediate from existing shared short courses without adding course-count requirements.

Planned project

Fictional one-month trading entity close with original receipts, transaction journal, reconciliations and linked statements. No tax filing or professional-accounting claim.

Existing supporting teaching

Source limits

Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
Algebra & FunctionsPlanned · required · source semester 1

Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

Proposed room: Business hall · B-PLAN-03 — not built or assigned.

Historical source ID: algebra-functions (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Translate a business quantity into an expression with units and domain restrictions and check equivalent forms

Planned outline — not authored lessons

  • Diagnose signed-number fraction and percentage fluency
  • Build expressions with units and allowable values
  • Transform equivalent expressions and preserve restrictions
  • Solve linear equations and verify substitution
  • Express constraints as inequalities and feasible ranges
  • Interpret functions through tables and graphs
  • Estimate slope intercept and break-even points
  • Solve two-variable systems and check feasibility
  • Model compound change with exponents
  • Use logarithms to recover a duration or rate
  • Compare quadratic turning points with domain limits
  • Audit a multi-model decision workbook and defend model limits

Intended outcomes

  • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
  • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
  • Compare linear, quadratic and exponential models and show how assumptions change a decision threshold

Prerequisites — historical references

None listed in this historical profile.

Corequisites — historical references

None listed in this historical profile.

Entry competencies

  • Read and annotate a short case; perform signed-number, fraction, percentage and unit calculations; preserve a local working file or paper record. Diagnose and remediate from existing shared short courses without adding course-count requirements.

Planned project

Extended versioned business-model portfolio with three models, units, verification and adverse scenarios. Existing twelve lessons provide a starting spine, not 108 authored hours.

Existing supporting teaching

Source limits

Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
Clear Writing & CommunicationPlanned · required · source semester 1

Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

Proposed room: Business hall · B-PLAN-04 — not built or assigned.

Historical source ID: clear-writing (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits

Planned outline — not authored lessons

  • Identify audience purpose and consequential action
  • Plan a document around questions the reader must answer
  • Build paragraphs with claims reasons and boundaries
  • Replace vague language with precise terms and quantities
  • Attribute sources and distinguish quotation from inference
  • Use tables and explanatory captions with text equivalents
  • Draft a concise analytical memo from a supplied case
  • Diagnose factual and structural faults in a peer-style draft
  • Prepare a short briefing with an accessible written equivalent
  • Revise for readers with different knowledge and priorities
  • Conduct scripted comprehension checks without inventing real users
  • Submit a revised communication portfolio and editorial rationale

Intended outcomes

  • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
  • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
  • Deliver accessible written and oral-equivalent communication with traceable sources and a reasoned change log

Prerequisites — historical references

None listed in this historical profile.

Corequisites — historical references

None listed in this historical profile.

Entry competencies

  • Read and annotate a short case; perform signed-number, fraction, percentage and unit calculations; preserve a local working file or paper record. Diagnose and remediate from existing shared short courses without adding course-count requirements.

Planned project

Versioned portfolio: decision memo, public-facing explanation, briefing transcript and revision log; simulated reader testing labelled as simulated.

Existing supporting teaching

Source limits

Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
Evidence, Sources & Clear ClaimsPlanned · required · source semester 1

Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

Proposed room: Business hall · B-PLAN-05 — not built or assigned.

Historical source ID: evidence-sources (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation

Planned outline — not authored lessons

  • Separate observations inferences and decisions
  • Bound a claim by population place time and measure
  • Trace quotations and numbers to original records
  • Record provenance dates editions and revisions
  • Distinguish study designs and what each can support
  • Inspect missing denominators selection and measurement
  • Compare contradictory sources without averaging incompatible claims
  • Check a supplied AI draft claim by claim
  • Create a reproducible search and exclusion log
  • Synthesize evidence into a decision brief
  • Respond to a skeptical review with explicit uncertainty
  • Revise the brief and deliver a verifiable source archive

Intended outcomes

  • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
  • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
  • Write a bounded evidence brief that documents search decisions, unsupported claims and a decision-changing information gap

Prerequisites — historical references

None listed in this historical profile.

Corequisites — historical references

None listed in this historical profile.

Entry competencies

  • Read and annotate a short case; perform signed-number, fraction, percentage and unit calculations; preserve a local working file or paper record. Diagnose and remediate from existing shared short courses without adding course-count requirements.

Planned project

Original evidence dossier using an approved public or supplied synthetic source packet; full research synthesis and causal methods are reserved for later courses.

Existing supporting teaching

Source limits

Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
Introductory EconomicsPlanned · required · source semester 2

Unresolved: this historical combined Economics profile must not replace newer separate Microeconomics 1000 and Macroeconomics 1001. Dependencies retain historical source IDs for audit only; no new canonical ID or equivalence is adopted.

Proposed room: Business hall · B-PLAN-06 — not built or assigned.

Historical source ID: introductory-economics (reference only, not a new canonical ID)

Basic aim — source outcome excerpt

Explain a market change using demand supply elasticity opportunity cost and explicit ceteris-paribus assumptions

Planned outline — not authored lessons

  • Use scarcity opportunity cost and marginal reasoning
  • Model demand supply and equilibrium shifts
  • Calculate elasticity and interpret revenue consequences
  • Explain costs competition market power and entry
  • Evaluate externalities public goods and information failures
  • Compare microeconomic policies and distributional effects
  • Distinguish GDP income welfare and measurement limits
  • Interpret price indices inflation and real quantities
  • Explain employment unemployment and labour-market measures
  • Trace monetary and fiscal policy channels with lags
  • Link exchange rates trade and external shocks
  • Submit an integrated market-and-macro evidence brief

Intended outcomes

  • Explain a market change using demand supply elasticity opportunity cost and explicit ceteris-paribus assumptions
  • Compare competition externalities public goods and policy responses while identifying distributional trade-offs
  • Interpret output inflation employment interest and exchange-rate indicators and trace a plausible business transmission channel without claiming a forecast

Prerequisites — historical references

  • business-foundations
    • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
    • Compare alternatives and switching costs, then justify a bounded value promise for a specified segment
    Source outcomes: business-foundations.O1, business-foundations.O2
  • algebra-functions
    • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
    • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
    Source outcomes: algebra-functions.O1, algebra-functions.O2

Corequisites — historical references

None listed in this historical profile.

Entry competencies

    Planned project

    A single integrated economics portfolio covering both micro and macro reasoning. This retains the old survey identity; no separate introductory micro/macro courses are counted.

    Existing supporting teaching

    Source limits

    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

    • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
    Spreadsheet FoundationsPlanned · required · source semester 2

    Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

    Proposed room: Business hall · B-PLAN-07 — not built or assigned.

    Historical source ID: spreadsheet-foundations (reference only, not a new canonical ID)

    Basic aim — source outcome excerpt

    Construct a tidy documented workbook whose inputs calculations and outputs can be independently inspected

    Planned outline — not authored lessons

    • Define rows columns types keys and missing-value rules
    • Preserve raw inputs and record transformations
    • Write formulas with units and simple error tests
    • Apply relative absolute and mixed references
    • Use lookups and check unmatched or duplicated keys
    • Aggregate categories while reconciling counts and totals
    • Build charts that preserve denominators and scales
    • Add validation and input-control checks
    • Separate assumptions formulas and presentation
    • Construct base adverse and favourable scenarios
    • Have another analyst rerun a scripted audit or label self-audit
    • Deliver a checked workbook with transfer-case corrections

    Intended outcomes

    • Construct a tidy documented workbook whose inputs calculations and outputs can be independently inspected
    • Use references lookups aggregation and validation to reconcile operational records to a stated control total
    • Build and stress-test a business scenario model with boundary tests error flags and a reproducible audit log

    Prerequisites — historical references

    • algebra-functions
      • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
      • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
      Source outcomes: algebra-functions.O1, algebra-functions.O2
    • accounting-foundations
      • Record a supplied transaction set using the accounting equation and double entry, with every journal entry balanced
      • Reconcile ledger balances to a trial balance and resolve a bank difference using an evidence trail
      Source outcomes: accounting-foundations.O1, accounting-foundations.O2

    Corequisites — historical references

    None listed in this historical profile.

    Entry competencies

      Planned project

      Original inventory-and-cash planning workbook with a data dictionary and audit sheet. Expansion adds modelling depth without creating a duplicate spreadsheet course.

      Existing supporting teaching

      Source limits

      Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

      • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
      • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
      • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
      Introductory StatisticsPlanned · required · source semester 2

      Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

      Proposed room: Business hall · B-PLAN-08 — not built or assigned.

      Historical source ID: introductory-statistics (reference only, not a new canonical ID)

      Basic aim — source outcome excerpt

      Define population sample unit variables and missingness rules and produce accurate descriptive comparisons

      Planned outline — not authored lessons

      • Define questions populations units and measurement
      • Diagnose sampling and missingness mechanisms
      • Construct frequency tables and honest charts
      • Compare centre robust summaries and outliers
      • Calculate spread and explain variation
      • Solve conditional-probability problems with denominators
      • Simulate sampling variability using supplied draws
      • Interpret confidence intervals and coverage assumptions
      • Compare p-values effect sizes and practical importance
      • Fit a simple regression and inspect confounding
      • Audit sensitivity analyses and multiple-comparison risks
      • Deliver a reproducible analysis on an unfamiliar synthetic case

      Intended outcomes

      • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
      • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
      • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence

      Prerequisites — historical references

      • algebra-functions
        • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
        • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
        Source outcomes: algebra-functions.O1, algebra-functions.O2
      • evidence-sources
        • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
        • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
        Source outcomes: evidence-sources.O1, evidence-sources.O2

      Corequisites — historical references

      None listed in this historical profile.

      Entry competencies

        Planned project

        Versioned extension of the existing service-wait project with repeated practice, new datasets and an independent transfer task; no duplicate descriptive-statistics identity.

        Existing supporting teaching

        Source limits

        Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

        • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
        • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
        • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
        Data Ethics & StewardshipPlanned · required · source semester 2

        Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

        Proposed room: Business hall · B-PLAN-09 — not built or assigned.

        Historical source ID: data-ethics-stewardship (reference only, not a new canonical ID)

        Basic aim — source outcome excerpt

        Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability

        Planned outline — not authored lessons

        • Define bounded purposes and affected stakeholders
        • Compare necessary and merely convenient fields
        • Analyse contextual sensitivity and linkage risk
        • Assess indirect identifiability in synthetic datasets
        • Design roles access and least-necessary sharing
        • Specify retention review and deletion verification
        • Record provenance permissions and transformations
        • Evaluate a proposed secondary use against the original purpose
        • Examine fairness accessibility and unequal burdens
        • Draft an incident response and escalation record
        • Challenge a governance proposal from another stakeholder view
        • Revise a stewardship dossier with unknowns and review dates

        Intended outcomes

        • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
        • Design task-based access retention provenance and sharing controls with accountable role descriptions
        • Resolve competing stakeholder interests in a documented stewardship decision and identify issues requiring jurisdiction-specific professional review

        Prerequisites — historical references

        • evidence-sources
          • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
          • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
          Source outcomes: evidence-sources.O1, evidence-sources.O2
        • business-foundations
          • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
          Source outcomes: business-foundations.O1

        Corequisites — historical references

        None listed in this historical profile.

        Entry competencies

          Planned project

          Fictional data-use proposal, minimization table, access matrix, retention schedule and decision record. Legal compliance remains unverified unless separately reviewed.

          Existing supporting teaching

          Source limits

          Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

          • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
          • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
          Decision Lab: everyday choices and evidencePlanned · required · source semester 2

          Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

          Proposed room: Business hall · B-PLAN-10 — not built or assigned.

          Historical source ID: decision-framing (reference only, not a new canonical ID)

          Basic aim — source outcome excerpt

          Frame a decision with distinct objectives hard constraints and at least three genuinely feasible options including the status quo

          Planned outline — not authored lessons

          • Separate symptoms decision and preferred solution
          • Identify owner affected parties and decision horizon
          • Distinguish objectives from binding constraints
          • Generate alternatives including a defensible status quo
          • Create an evidence table with uncertainty labels
          • Apply criteria without double counting
          • Compare weighted and unweighted judgments
          • Stress-test weights values and operating conditions
          • Identify value of information and a bounded next check
          • Design reversible trials and stop rules
          • Defend a recommendation against a changed scenario
          • Revise the decision dossier and document disagreement

          Intended outcomes

          • Frame a decision with distinct objectives hard constraints and at least three genuinely feasible options including the status quo
          • Construct an auditable comparison that avoids double-counted criteria and tests thresholds that reverse a recommendation
          • Specify a reversible trial with observable outcomes stop conditions and an honest revision after new evidence

          Prerequisites — historical references

          • business-foundations
            • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
            • Connect channels, revenue mechanisms, delivery activity, resources and capacity in one internally consistent model
            Source outcomes: business-foundations.O1, business-foundations.O3
          • evidence-sources
            • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
            • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
            Source outcomes: evidence-sources.O1, evidence-sources.O2
          • algebra-functions
            • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
            • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
            Source outcomes: algebra-functions.O1, algebra-functions.O2

          Corequisites — historical references

          None listed in this historical profile.

          Entry competencies

            Planned project

            Expanded Cedar Room-style fictional dossier using new scenarios and transfer assessment; preserves current eight-lesson identity and reviewed-state meanings.

            Existing supporting teaching

            Source limits

            Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

            • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
            • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
            Managerial Accounting & ControlPlanned · required · source semester 3

            Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

            Proposed room: Business hall · B-PLAN-11 — not built or assigned.

            Historical source ID: managerial-accounting (reference only, not a new canonical ID)

            Basic aim — source outcome excerpt

            Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records

            Planned outline — not authored lessons

            • Distinguish reporting and decision cost purposes
            • Trace direct indirect fixed and variable costs
            • Calculate contribution and break-even ranges
            • Compare job process and activity allocations
            • Identify relevant opportunity and sunk costs
            • Evaluate make-or-buy and constrained-product choices
            • Construct a flexible operating budget
            • Link cash budgets and working-capital assumptions
            • Explain price volume and efficiency variances
            • Assess incentives gaming and responsibility centres
            • Stress-test a control proposal under changed demand
            • Deliver an auditable cost-and-control recommendation

            Intended outcomes

            • Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records
            • Compare relevant-cost volume-profit budget and variance analyses without treating sunk costs as avoidable
            • Recommend a management control with behavioural consequences and sensitivity to uncertain demand

            Prerequisites — historical references

            • accounting-foundations
              • Record a supplied transaction set using the accounting equation and double entry, with every journal entry balanced
              • Reconcile ledger balances to a trial balance and resolve a bank difference using an evidence trail
              • Produce linked introductory income, financial-position and cash summaries after justified period-end adjustments and explain cash-profit differences
              Source outcomes: accounting-foundations.O1, accounting-foundations.O2, accounting-foundations.O3
            • spreadsheet-foundations
              • Construct a tidy documented workbook whose inputs calculations and outputs can be independently inspected
              • Use references lookups aggregation and validation to reconcile operational records to a stated control total
              Source outcomes: spreadsheet-foundations.O1, spreadsheet-foundations.O2

            Corequisites — historical references

            None listed in this historical profile.

            Entry competencies

              Planned project

              Fictional multi-service enterprise budget, decision model and control memo with documented allocation assumptions.

              Existing supporting teaching

              Source limits

              Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

              • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
              • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
              Organizational BehaviourPlanned · required · source semester 3

              Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

              Planning room: Business hall · Level 3 · B301 — read-only outline, not a taught class.

              Historical source ID: organizational-behaviour (reference only, not a new canonical ID)

              Basic aim — source outcome excerpt

              Compare at least two theories of motivation teams and organizational design against observed case evidence

              Planned outline — not authored lessons

              • Distinguish individual team and organization explanations
              • Compare motivation models and their limits
              • Examine perception attribution and decision bias
              • Analyse roles norms and team coordination
              • Compare conflict and cooperation mechanisms
              • Map power authority and informal influence
              • Examine culture identity and inclusion in context
              • Compare organizational structures and dependencies
              • Diagnose incentives and information bottlenecks
              • Design a bounded intervention and evaluation measure
              • Conduct a scripted team-case seminar with dissent
              • Revise a theory-grounded organizational diagnosis

              Intended outcomes

              • Compare at least two theories of motivation teams and organizational design against observed case evidence
              • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
              • Propose and critique a feasible team or organizational intervention with observable outcomes and an ethical boundary

              Prerequisites — historical references

              • business-foundations
                • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
                • Connect channels, revenue mechanisms, delivery activity, resources and capacity in one internally consistent model
                Source outcomes: business-foundations.O1, business-foundations.O3
              • clear-writing
                • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
                • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
                Source outcomes: clear-writing.O1, clear-writing.O2

              Corequisites — historical references

              None listed in this historical profile.

              Entry competencies

                Planned project

                Multi-perspective fictional workplace diagnosis and intervention memo; role simulations can use supplied transcripts without recruiting a team.

                Existing supporting teaching

                Source limits

                Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                Marketing FoundationsPlanned · required · source semester 3

                Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                Planning room: Business hall · Level 3 · B302 — read-only outline, not a taught class.

                Historical source ID: marketing-foundations (reference only, not a new canonical ID)

                Basic aim — source outcome excerpt

                Define a defensible customer segment and value proposition using evidence that separates needs from unsupported personas

                Planned outline — not authored lessons

                • Define customer value and a bounded market
                • Identify needs without inventing customer testimony
                • Compare segmentation targeting and positioning
                • Link offering design and accessible service requirements
                • Analyse prices willingness to pay and contribution
                • Compare channels reach and service costs
                • Examine promotion claims and evidence standards
                • Map acquisition conversion retention and churn
                • Check denominators attribution and lifetime-value assumptions
                • Align a marketing mix to capacity and ethics
                • Stress-test a plan against competitor and demand scenarios
                • Submit a coherent marketing plan and measurement protocol

                Intended outcomes

                • Define a defensible customer segment and value proposition using evidence that separates needs from unsupported personas
                • Compare product pricing channel and communication choices for consistency with margin capacity and customer access
                • Design a measurement plan that distinguishes reach acquisition retention contribution and causal impact

                Prerequisites — historical references

                • business-foundations
                  • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
                  • Compare alternatives and switching costs, then justify a bounded value promise for a specified segment
                  Source outcomes: business-foundations.O1, business-foundations.O2
                • introductory-economics
                  • Explain a market change using demand supply elasticity opportunity cost and explicit ceteris-paribus assumptions
                  • Compare competition externalities public goods and policy responses while identifying distributional trade-offs
                  Source outcomes: introductory-economics.O1, introductory-economics.O2

                Corequisites — historical references

                None listed in this historical profile.

                Entry competencies

                  Planned project

                  Marketing plan for a fictional service with supplied market evidence, contribution calculations and testable measurement definitions.

                  Existing supporting teaching

                  Source limits

                  Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                  Research Design & Fair ComparisonsPlanned · required · source semester 3

                  Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                  Proposed room: Business hall · B-PLAN-14 — not built or assigned.

                  Historical source ID: research-design-foundations (reference only, not a new canonical ID)

                  Basic aim — source outcome excerpt

                  Translate a management question into a measurable estimand and a defensible sampling or comparison design

                  Planned outline — not authored lessons

                  • Specify a decision question and target estimand
                  • Operationalize constructs and assess measurement validity
                  • Choose sampling frames and recruitment limits
                  • Distinguish sampling from treatment assignment
                  • Draw causal assumptions and identify confounding
                  • Design randomized comparisons with practical constraints
                  • Appraise observational and quasi-experimental alternatives
                  • Draft survey items and diagnose response bias
                  • Develop an interview protocol and qualitative coding rules
                  • Pre-specify analysis missingness and stopping decisions
                  • Pilot on synthetic records and revise the protocol
                  • Defend a feasible proposal and its inference limits

                  Intended outcomes

                  • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                  • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                  • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision

                  Prerequisites — historical references

                  • introductory-statistics
                    • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                    • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                    • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence
                    Source outcomes: introductory-statistics.O1, introductory-statistics.O2, introductory-statistics.O3
                  • evidence-sources
                    • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                    • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                    • Write a bounded evidence brief that documents search decisions, unsupported claims and a decision-changing information gap
                    Source outcomes: evidence-sources.O1, evidence-sources.O2, evidence-sources.O3
                  • data-ethics-stewardship
                    • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                    • Design task-based access retention provenance and sharing controls with accountable role descriptions
                    Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2

                  Corequisites — historical references

                  None listed in this historical profile.

                  Entry competencies

                    Planned project

                    Synthetic-data research protocol and small pilot analysis. Human-participant collection is not authorized or supplied by this map.

                    Existing supporting teaching

                    Source limits

                    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                    • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                    Corporate FinancePlanned · required · source semester 4

                    Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                    Planning room: Business hall · Level 3 · B303 — read-only outline, not a taught class.

                    Historical source ID: corporate-finance (reference only, not a new canonical ID)

                    Basic aim — source outcome excerpt

                    Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions

                    Planned outline — not authored lessons

                    • Link statements to financing and investment decisions
                    • Calculate present and future value of cash flows
                    • Separate nominal real and effective rates
                    • Build incremental project cash-flow forecasts
                    • Compare net present value payback and internal-rate pitfalls
                    • Stress-test growth discount rates and terminal values
                    • Explain risk return diversification and model limits
                    • Estimate financing costs with transparent assumptions
                    • Compare debt equity and capital-structure trade-offs
                    • Analyse working-capital and liquidity policies
                    • Examine payout agency and governance implications
                    • Defend an investment recommendation with adverse scenarios

                    Intended outcomes

                    • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                    • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                    • Explain how capital structure payout and governance choices allocate risk without presenting model outputs as investment advice

                    Prerequisites — historical references

                    • accounting-foundations
                      • Reconcile ledger balances to a trial balance and resolve a bank difference using an evidence trail
                      • Produce linked introductory income, financial-position and cash summaries after justified period-end adjustments and explain cash-profit differences
                      Source outcomes: accounting-foundations.O2, accounting-foundations.O3
                    • managerial-accounting
                      • Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records
                      • Compare relevant-cost volume-profit budget and variance analyses without treating sunk costs as avoidable
                      Source outcomes: managerial-accounting.O1, managerial-accounting.O2
                    • introductory-statistics
                      • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                      • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence
                      Source outcomes: introductory-statistics.O2, introductory-statistics.O3

                    Corequisites — historical references

                    None listed in this historical profile.

                    Entry competencies

                      Planned project

                      Synthetic equipment-investment case and financing memo with independently checked cash-flow timing; no personal investment recommendation.

                      Existing supporting teaching

                      • Algebra & Functions — Existing teaching / preparation only; not completion of this planned semester profile
                      • Spreadsheet Foundations — Existing teaching / preparation only; not completion of this planned semester profile

                      Source limits

                      Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                      • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                      • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                      • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                      Operations ManagementPlanned · required · source semester 4

                      Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                      Planning room: Business hall · Level 3 · B304 — read-only outline, not a taught class.

                      Historical source ID: operations-management (reference only, not a new canonical ID)

                      Basic aim — source outcome excerpt

                      Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries

                      Planned outline — not authored lessons

                      • Define process boundaries demand and customer promise
                      • Map actions decisions queues and handoffs
                      • Calculate capacity bottlenecks and utilization
                      • Distinguish flow time work time and throughput
                      • Forecast demand and report error rather than certainty
                      • Compare inventory policies and stockout assumptions
                      • Evaluate service queues and capacity alternatives
                      • Construct resource-constrained schedules
                      • Analyse quality rework and prevention costs
                      • Compare lean flow resilience and safeguard trade-offs
                      • Run a disruption scenario against the proposed design
                      • Deliver a reconciled operations plan and evaluation protocol

                      Intended outcomes

                      • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                      • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                      • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls

                      Prerequisites — historical references

                      • managerial-accounting
                        • Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records
                        • Compare relevant-cost volume-profit budget and variance analyses without treating sunk costs as avoidable
                        Source outcomes: managerial-accounting.O1, managerial-accounting.O2
                      • introductory-statistics
                        • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                        • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                        Source outcomes: introductory-statistics.O1, introductory-statistics.O2
                      • spreadsheet-foundations
                        • Construct a tidy documented workbook whose inputs calculations and outputs can be independently inspected
                        • Use references lookups aggregation and validation to reconcile operational records to a stated control total
                        Source outcomes: spreadsheet-foundations.O1, spreadsheet-foundations.O2

                      Corequisites — historical references

                      None listed in this historical profile.

                      Entry competencies

                        Planned project

                        Fictional repair-service capacity and inventory model; existing Process Mapping supplies a shared primer, not another counted course.

                        Existing supporting teaching

                        Source limits

                        Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                        • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                        • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                        • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                        Business Law & Governance LiteracyPlanned · required · source semester 4

                        Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                        Proposed room: Business hall · B-PLAN-17 — not built or assigned.

                        Historical source ID: business-law-governance (reference only, not a new canonical ID)

                        Basic aim — source outcome excerpt

                        Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy

                        Planned outline — not authored lessons

                        • Separate legal issue spotting from legal advice
                        • Identify jurisdiction authority and effective dates
                        • Compare organizational forms and delegated authority
                        • Map contract formation and evidence of agreement
                        • Analyse performance breach remedy and dispute questions
                        • Review liability and insurance concepts as questions
                        • Identify employment and workplace-policy issue categories
                        • Trace privacy consumer and competition questions to sources
                        • Compare boards executives members and accountability
                        • Review conflicts related-party transactions and controls
                        • Prepare an escalation brief with unresolved legal questions
                        • Revise a governance charter after a fictional failure

                        Intended outcomes

                        • Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy
                        • Identify formation authority obligation remedy and risk-allocation questions in a fictional agreement without supplying a legal conclusion
                        • Compare governance roles accountability and internal control mechanisms and prepare a clear escalation brief for qualified review

                        Prerequisites — historical references

                        • business-foundations
                          • Distinguish customers, users, decision makers and payers, and evaluate what supplied observations do and do not show about demand
                          • Connect channels, revenue mechanisms, delivery activity, resources and capacity in one internally consistent model
                          Source outcomes: business-foundations.O1, business-foundations.O3
                        • evidence-sources
                          • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                          • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                          Source outcomes: evidence-sources.O1, evidence-sources.O2
                        • data-ethics-stewardship
                          • Design task-based access retention provenance and sharing controls with accountable role descriptions
                          • Resolve competing stakeholder interests in a documented stewardship decision and identify issues requiring jurisdiction-specific professional review
                          Source outcomes: data-ethics-stewardship.O2, data-ethics-stewardship.O3

                        Corequisites — historical references

                        None listed in this historical profile.

                        Entry competencies

                          Planned project

                          Source-traced issue brief and governance charter for a fictional organization. Exact current legal teaching must be separately authored and professionally reviewed for a named jurisdiction.

                          Existing supporting teaching

                          Source limits

                          Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                          • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                          • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                          Relational Data & SQLPlanned · required · source semester 4

                          Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge. Reserved Accounting/SQL owner work must not be duplicated or reassigned.

                          Proposed room: Business hall · B-PLAN-18 — not built or assigned.

                          Historical source ID: relational-data-sql (reference only, not a new canonical ID)

                          Basic aim — source outcome excerpt

                          Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain

                          Planned outline — not authored lessons

                          • Define relational grain entities and data dictionaries
                          • Choose primary foreign and candidate keys
                          • Normalize repeated facts and test dependencies
                          • Load synthetic tables with types and constraints
                          • Filter sort and calculate with explicit null handling
                          • Join tables and detect row multiplication
                          • Aggregate with group-level denominator checks
                          • Use subqueries and common-table expressions
                          • Test constraints transactions and correction workflows
                          • Plan access permissions and retention boundaries
                          • Optimize for clarity and inspect query execution logically
                          • Deliver queries tests results and a reproducible handoff

                          Intended outcomes

                          • Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain
                          • Write and validate selection join aggregate and subquery operations against known control cases
                          • Deliver a reproducible query analysis that preserves provenance access limits missingness and reconciliation to source totals

                          Prerequisites — historical references

                          • spreadsheet-foundations
                            • Construct a tidy documented workbook whose inputs calculations and outputs can be independently inspected
                            • Use references lookups aggregation and validation to reconcile operational records to a stated control total
                            • Build and stress-test a business scenario model with boundary tests error flags and a reproducible audit log
                            Source outcomes: spreadsheet-foundations.O1, spreadsheet-foundations.O2, spreadsheet-foundations.O3
                          • data-ethics-stewardship
                            • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                            • Design task-based access retention provenance and sharing controls with accountable role descriptions
                            Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2
                          • introductory-statistics
                            • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                            Source outcomes: introductory-statistics.O1

                          Corequisites — historical references

                          None listed in this historical profile.

                          Entry competencies

                            Planned project

                            Local or browser-sandbox synthetic order database with SQL scripts, test fixtures and a source-to-result reconciliation; no private production connection.

                            Existing supporting teaching

                            Source limits

                            Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                            • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                            • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                            • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                            Managerial Economics & Market DecisionsPlanned · required · source semester 5

                            Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                            Proposed room: Business hall · B-PLAN-19 — not built or assigned.

                            Historical source ID: managerial-economics (reference only, not a new canonical ID)

                            Basic aim — source outcome excerpt

                            Estimate and critique demand and cost relationships using supplied data with identification limits stated

                            Planned outline — not authored lessons

                            • Translate a management decision into objectives constraints and margins
                            • Estimate demand with explicit sample and identification limits
                            • Compare elasticities across segments without extrapolating blindly
                            • Model cost production and capacity trade-offs
                            • Solve a constrained contribution-maximization case
                            • Compare uniform segmented and time-dependent pricing
                            • Analyse strategic interaction with payoff tables
                            • Examine entry commitment and competitive response
                            • Assess information asymmetry and principal-agent problems
                            • Design incentive and contract alternatives
                            • Integrate a macroeconomic shock as a scenario rather than a forecast
                            • Defend a market decision with sensitivity and identification limits

                            Intended outcomes

                            • Estimate and critique demand and cost relationships using supplied data with identification limits stated
                            • Compare constrained pricing entry and competitive-response choices using marginal reasoning and scenario analysis
                            • Explain how contracts incentives and information asymmetry alter a decision and test assumptions that reverse the preferred option

                            Prerequisites — historical references

                            • introductory-economics
                              • Explain a market change using demand supply elasticity opportunity cost and explicit ceteris-paribus assumptions
                              • Compare competition externalities public goods and policy responses while identifying distributional trade-offs
                              • Interpret output inflation employment interest and exchange-rate indicators and trace a plausible business transmission channel without claiming a forecast
                              Source outcomes: introductory-economics.O1, introductory-economics.O2, introductory-economics.O3
                            • corporate-finance
                              • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                              • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                              Source outcomes: corporate-finance.O1, corporate-finance.O2
                            • introductory-statistics
                              • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                              • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence
                              Source outcomes: introductory-statistics.O2, introductory-statistics.O3

                            Corequisites — historical references

                            None listed in this historical profile.

                            Entry competencies

                              Planned project

                              Original pricing-and-capacity case with demand estimates, game scenarios and a defended decision. Builds on integrated Economics rather than repeating introductory micro or macro.

                              Existing supporting teaching

                              • Algebra & Functions — Existing teaching / preparation only; not completion of this planned semester profile
                              • Introductory Statistics — Existing teaching / preparation only; not completion of this planned semester profile

                              Source limits

                              Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                              • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                              • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                              • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                              Human Resource ManagementPlanned · required · source semester 5

                              Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                              Proposed room: Business hall · B-PLAN-20 — not built or assigned.

                              Historical source ID: human-resource-management (reference only, not a new canonical ID)

                              Basic aim — source outcome excerpt

                              Translate an operating plan into a defensible workforce and job analysis with transparent assumptions

                              Planned outline — not authored lessons

                              • Link workforce demand to organizational strategy
                              • Conduct a fictional task and job analysis
                              • Specify competencies and accessible role requirements
                              • Compare recruitment channels and selection evidence
                              • Evaluate structured assessment and bias risks
                              • Plan onboarding and learning transfer
                              • Compare performance feedback and appraisal systems
                              • Analyse compensation incentives and equity questions
                              • Examine employee voice conflict and workplace wellbeing
                              • Trace legal issue categories to qualified review needs
                              • Define people metrics with privacy and inference limits
                              • Deliver a workforce-process proposal and stakeholder response

                              Intended outcomes

                              • Translate an operating plan into a defensible workforce and job analysis with transparent assumptions
                              • Compare selection development reward and performance approaches using validity fairness accessibility and incentive effects
                              • Design an evidence-based people-process proposal with privacy boundaries escalation requirements and an evaluation plan

                              Prerequisites — historical references

                              • organizational-behaviour
                                • Compare at least two theories of motivation teams and organizational design against observed case evidence
                                • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
                                • Propose and critique a feasible team or organizational intervention with observable outcomes and an ethical boundary
                                Source outcomes: organizational-behaviour.O1, organizational-behaviour.O2, organizational-behaviour.O3
                              • business-law-governance
                                • Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy
                                • Compare governance roles accountability and internal control mechanisms and prepare a clear escalation brief for qualified review
                                Source outcomes: business-law-governance.O1, business-law-governance.O3
                              • data-ethics-stewardship
                                • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                                • Design task-based access retention provenance and sharing controls with accountable role descriptions
                                Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2

                              Corequisites — historical references

                              None listed in this historical profile.

                              Entry competencies

                                Planned project

                                Fictional staffing and development case using synthetic role and assessment records. No actual hiring, psychological diagnosis or legal compliance certification.

                                Existing supporting teaching

                                Source limits

                                Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                Marketing Research & Customer EvidencePlanned · required · source semester 5

                                Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                Proposed room: Business hall · B-PLAN-21 — not built or assigned.

                                Historical source ID: marketing-research (reference only, not a new canonical ID)

                                Basic aim — source outcome excerpt

                                Design a fit-for-purpose customer inquiry with defensible population instrument sampling and ethics choices

                                Planned outline — not authored lessons

                                • Convert a marketing choice into research questions
                                • Audit secondary market evidence and source fit
                                • Specify a sampling frame and response risks
                                • Draft neutral survey measures and response options
                                • Pilot instruments with synthetic response patterns
                                • Build interview guides and qualitative coding rules
                                • Estimate segment differences with uncertainty
                                • Analyse conjoint-style trade-offs from supplied choices without overclaiming
                                • Compare experiments and observational campaign evidence
                                • Reconcile qualitative themes with quantitative patterns
                                • Translate findings into bounded managerial choices
                                • Submit a research report and defend a next-test proposal

                                Intended outcomes

                                • Design a fit-for-purpose customer inquiry with defensible population instrument sampling and ethics choices
                                • Analyse synthetic quantitative and qualitative customer evidence while preserving uncertainty nonresponse and competing interpretations
                                • Recommend a marketing decision whose strength is proportional to the evidence and specify a useful next experiment

                                Prerequisites — historical references

                                • marketing-foundations
                                  • Define a defensible customer segment and value proposition using evidence that separates needs from unsupported personas
                                  • Compare product pricing channel and communication choices for consistency with margin capacity and customer access
                                  • Design a measurement plan that distinguishes reach acquisition retention contribution and causal impact
                                  Source outcomes: marketing-foundations.O1, marketing-foundations.O2, marketing-foundations.O3
                                • research-design-foundations
                                  • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                                  • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                                  • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision
                                  Source outcomes: research-design-foundations.O1, research-design-foundations.O2, research-design-foundations.O3
                                • introductory-statistics
                                  • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                                  • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                                  • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence
                                  Source outcomes: introductory-statistics.O1, introductory-statistics.O2, introductory-statistics.O3

                                Corequisites — historical references

                                None listed in this historical profile.

                                Entry competencies

                                  Planned project

                                  Synthetic survey and interview packet, codebook, analysis and decision brief. Actual recruitment requires a separate authorized review arrangement.

                                  Existing supporting teaching

                                  Source limits

                                  Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                  Project Planning & DeliveryPlanned · required · source semester 5

                                  Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                  Proposed room: Business hall · B-PLAN-22 — not built or assigned.

                                  Historical source ID: project-planning-delivery (reference only, not a new canonical ID)

                                  Basic aim — source outcome excerpt

                                  Define project scope deliverables acceptance criteria and exclusions traceable to a stakeholder need

                                  Planned outline — not authored lessons

                                  • Distinguish a project from ongoing operations
                                  • Develop a charter with scope and exclusions
                                  • Translate needs into testable requirements
                                  • Decompose deliverables and define acceptance evidence
                                  • Sequence dependencies and identify critical paths
                                  • Assign constrained resources without fictional staffing promises
                                  • Estimate cost uncertainty and contingency
                                  • Create risk triggers owners and response plans
                                  • Define communication decision and change-control routines
                                  • Replan after a supplied supplier or capacity disruption
                                  • Verify acceptance and prepare a recoverable handover
                                  • Review outcomes against baseline and revise the plan

                                  Intended outcomes

                                  • Define project scope deliverables acceptance criteria and exclusions traceable to a stakeholder need
                                  • Produce a resource-constrained dependency schedule budget and risk register with a change-control rule
                                  • Respond to a simulated disruption and deliver an auditable acceptance handover with honest status and lessons

                                  Prerequisites — historical references

                                  • decision-framing
                                    • Frame a decision with distinct objectives hard constraints and at least three genuinely feasible options including the status quo
                                    • Construct an auditable comparison that avoids double-counted criteria and tests thresholds that reverse a recommendation
                                    • Specify a reversible trial with observable outcomes stop conditions and an honest revision after new evidence
                                    Source outcomes: decision-framing.O1, decision-framing.O2, decision-framing.O3
                                  • operations-management
                                    • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                    • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                                    • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls
                                    Source outcomes: operations-management.O1, operations-management.O2, operations-management.O3
                                  • organizational-behaviour
                                    • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
                                    • Propose and critique a feasible team or organizational intervention with observable outcomes and an ethical boundary
                                    Source outcomes: organizational-behaviour.O2, organizational-behaviour.O3

                                  Corequisites — historical references

                                  None listed in this historical profile.

                                  Entry competencies

                                    Planned project

                                    Fictional service-launch project: charter, requirement trace, resource schedule, cost/risk model, disruption response and handover. Retains prior B01 proposal.

                                    Existing supporting teaching

                                    Source limits

                                    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                    Strategic AnalysisPlanned · required · source semester 6

                                    Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                    Proposed room: Business hall · B-PLAN-23 — not built or assigned.

                                    Historical source ID: strategy-analysis (reference only, not a new canonical ID)

                                    Basic aim — source outcome excerpt

                                    Explain a strategic performance problem by connecting industry economics resources activities and stakeholder obligations

                                    Planned outline — not authored lessons

                                    • Define strategy scope and the performance question
                                    • Analyse industry structure and changing boundaries
                                    • Examine competitors complements and substitutes
                                    • Map resources capabilities and activity systems
                                    • Compare cost differentiation and focus choices
                                    • Analyse platform network and ecosystem conditions
                                    • Evaluate vertical scope partnerships and make-or-buy
                                    • Compare diversification and corporate parenting claims
                                    • Reconcile strategic options to financial and capacity models
                                    • Stress-test scenarios and disconfirming evidence
                                    • Conduct an integrated case challenge
                                    • Deliver a strategic decision brief with uncertainty and triggers

                                    Intended outcomes

                                    • Explain a strategic performance problem by connecting industry economics resources activities and stakeholder obligations
                                    • Compare at least three coherent strategic alternatives using financial operational and organizational evidence
                                    • Recommend a bounded strategic choice with explicit trade-offs disconfirming evidence and measurable assumptions

                                    Prerequisites — historical references

                                    • managerial-economics
                                      • Estimate and critique demand and cost relationships using supplied data with identification limits stated
                                      • Compare constrained pricing entry and competitive-response choices using marginal reasoning and scenario analysis
                                      • Explain how contracts incentives and information asymmetry alter a decision and test assumptions that reverse the preferred option
                                      Source outcomes: managerial-economics.O1, managerial-economics.O2, managerial-economics.O3
                                    • corporate-finance
                                      • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                                      • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                                      Source outcomes: corporate-finance.O1, corporate-finance.O2
                                    • marketing-foundations
                                      • Define a defensible customer segment and value proposition using evidence that separates needs from unsupported personas
                                      • Compare product pricing channel and communication choices for consistency with margin capacity and customer access
                                      Source outcomes: marketing-foundations.O1, marketing-foundations.O2
                                    • operations-management
                                      • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                      • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                                      Source outcomes: operations-management.O1, operations-management.O2
                                    • organizational-behaviour
                                      • Compare at least two theories of motivation teams and organizational design against observed case evidence
                                      • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
                                      Source outcomes: organizational-behaviour.O1, organizational-behaviour.O2

                                    Corequisites — historical references

                                    None listed in this historical profile.

                                    Entry competencies

                                      Planned project

                                      Integrated fictional-enterprise strategy case using previously learned finance, marketing, operations and organizational analysis; standalone strategy outcomes now separated from the old broad B16 profile.

                                      Existing supporting teaching

                                      Source limits

                                      Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                      • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                      • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                      • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                      Information Systems & Digital ManagementPlanned · required · source semester 6

                                      Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                      Proposed room: Business hall · B-PLAN-24 — not built or assigned.

                                      Historical source ID: information-systems-management (reference only, not a new canonical ID)

                                      Basic aim — source outcome excerpt

                                      Map a business information flow to data applications controls and stakeholder responsibilities

                                      Planned outline — not authored lessons

                                      • Map processes information flows and system boundaries
                                      • Compare transaction analytical and collaboration systems
                                      • Trace data quality and stewardship responsibilities
                                      • Specify interoperability and integration requirements
                                      • Compare build buy and vendor-exit alternatives
                                      • Estimate lifecycle cost benefit and uncertainty
                                      • Analyse security controls and recovery objectives conceptually
                                      • Evaluate AI-assisted workflows with human review and error costs
                                      • Plan adoption migration and accessibility checks
                                      • Design acceptance tests incident escalation and rollback
                                      • Stress-test dependency failure and vendor-change scenarios
                                      • Defend a digital investment and governance proposal

                                      Intended outcomes

                                      • Map a business information flow to data applications controls and stakeholder responsibilities
                                      • Compare build buy integration and automation alternatives using lifecycle value reliability access and exit costs
                                      • Design a governed digital-change proposal with testable requirements incident recovery and human decision boundaries

                                      Prerequisites — historical references

                                      • relational-data-sql
                                        • Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain
                                        • Write and validate selection join aggregate and subquery operations against known control cases
                                        • Deliver a reproducible query analysis that preserves provenance access limits missingness and reconciliation to source totals
                                        Source outcomes: relational-data-sql.O1, relational-data-sql.O2, relational-data-sql.O3
                                      • project-planning-delivery
                                        • Define project scope deliverables acceptance criteria and exclusions traceable to a stakeholder need
                                        • Produce a resource-constrained dependency schedule budget and risk register with a change-control rule
                                        Source outcomes: project-planning-delivery.O1, project-planning-delivery.O2
                                      • data-ethics-stewardship
                                        • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                                        • Design task-based access retention provenance and sharing controls with accountable role descriptions
                                        • Resolve competing stakeholder interests in a documented stewardship decision and identify issues requiring jurisdiction-specific professional review
                                        Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2, data-ethics-stewardship.O3

                                      Corequisites — historical references

                                      None listed in this historical profile.

                                      Entry competencies

                                        Planned project

                                        Fictional service-system acquisition and integration proposal. No account/sync implementation, real access provisioning, live deployment or security certification.

                                        Existing supporting teaching

                                        Source limits

                                        Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                        • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                        • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                        Quality Improvement & EvaluationPlanned · required · source semester 6

                                        Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                        Proposed room: Business hall · B-PLAN-25 — not built or assigned.

                                        Historical source ID: quality-improvement (reference only, not a new canonical ID)

                                        Basic aim — source outcome excerpt

                                        Define quality outcome process and balancing measures with defensible units denominators and data-collection rules

                                        Planned outline — not authored lessons

                                        • Define quality from multiple stakeholder perspectives
                                        • Operationalize outcome process and balancing measures
                                        • Audit measurement repeatability and missingness
                                        • Distinguish variation signal and noise
                                        • Build and interpret introductory control charts
                                        • Analyse causes without confusing association and explanation
                                        • Compare intervention options and failure modes
                                        • Design a reversible test with stop conditions
                                        • Choose a comparison and analysis plan
                                        • Evaluate synthetic before-after and comparator data
                                        • Assess sustainability unintended effects and learning
                                        • Deliver an improvement dossier with calibrated conclusions

                                        Intended outcomes

                                        • Define quality outcome process and balancing measures with defensible units denominators and data-collection rules
                                        • Distinguish common and special variation and appraise causal claims about an improvement using an appropriate comparison
                                        • Design and evaluate a reversible improvement cycle that retains controls records adverse effects and supports revision

                                        Prerequisites — historical references

                                        • operations-management
                                          • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                          • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                                          • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls
                                          Source outcomes: operations-management.O1, operations-management.O2, operations-management.O3
                                        • research-design-foundations
                                          • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                                          • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                                          • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision
                                          Source outcomes: research-design-foundations.O1, research-design-foundations.O2, research-design-foundations.O3
                                        • introductory-statistics
                                          • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                                          • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                                          • Fit and critique a simple association model and deliver a reproducible report that separates causal claims from descriptive evidence
                                          Source outcomes: introductory-statistics.O1, introductory-statistics.O2, introductory-statistics.O3

                                        Corequisites — historical references

                                        None listed in this historical profile.

                                        Entry competencies

                                          Planned project

                                          Fictional service-quality intervention evaluated on synthetic data, preserving necessary safeguards. Process Mapping is mapped once as preparation; this course adds measurement and evaluation depth.

                                          Existing supporting teaching

                                          Source limits

                                          Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                          • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                          • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                          Global Business & SustainabilityPlanned · required · source semester 6

                                          Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                          Proposed room: Business hall · B-PLAN-26 — not built or assigned.

                                          Historical source ID: global-business-sustainability (reference only, not a new canonical ID)

                                          Basic aim — source outcome excerpt

                                          Analyse a cross-border business decision using trade institutions currency logistics and cultural assumptions with explicit geographic limits

                                          Planned outline — not authored lessons

                                          • Define cross-border scope stakeholders and jurisdiction
                                          • Analyse trade comparative advantage and distribution
                                          • Interpret currency exposure and exchange-rate scenarios
                                          • Compare institutional and cultural explanations cautiously
                                          • Map global sourcing logistics and disruption risks
                                          • Examine labour rights and supply-chain evidence limits
                                          • Define sustainability boundaries functional units and baselines
                                          • Compare emissions resource and waste measures conceptually
                                          • Examine lifecycle trade-offs and burden shifting
                                          • Critique disclosure targets offsets and unsupported claims
                                          • Evaluate international or sustainability alternatives
                                          • Defend a bounded recommendation with monitoring and uncertainty

                                          Intended outcomes

                                          • Analyse a cross-border business decision using trade institutions currency logistics and cultural assumptions with explicit geographic limits
                                          • Compare environmental and social impacts across an operational boundary without shifting burdens invisibly
                                          • Develop a feasible international or sustainability recommendation with source-traced claims scenario analysis and affected-stakeholder perspectives

                                          Prerequisites — historical references

                                          • introductory-economics
                                            • Compare competition externalities public goods and policy responses while identifying distributional trade-offs
                                            • Interpret output inflation employment interest and exchange-rate indicators and trace a plausible business transmission channel without claiming a forecast
                                            Source outcomes: introductory-economics.O2, introductory-economics.O3
                                          • business-law-governance
                                            • Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy
                                            • Compare governance roles accountability and internal control mechanisms and prepare a clear escalation brief for qualified review
                                            Source outcomes: business-law-governance.O1, business-law-governance.O3
                                          • operations-management
                                            • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                            • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls
                                            Source outcomes: operations-management.O1, operations-management.O3

                                          Corequisites — historical references

                                          None listed in this historical profile.

                                          Entry competencies

                                            Planned project

                                            Synthetic sourcing and sustainability case with current official context sources to be selected and refreshed during authoring; no claim of verified carbon accounting.

                                            Existing supporting teaching

                                            Source limits

                                            Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                            • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                            • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                            Strategic Implementation & ChangePlanned · required · source semester 7

                                            Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                            Proposed room: Business hall · B-PLAN-27 — not built or assigned.

                                            Historical source ID: strategic-implementation-change (reference only, not a new canonical ID)

                                            Basic aim — source outcome excerpt

                                            Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions

                                            Planned outline — not authored lessons

                                            • Translate strategic choices into a theory of change
                                            • Specify workstreams dependencies and success measures
                                            • Map decision rights resources and accountability
                                            • Diagnose stakeholder interests power and resistance
                                            • Compare change approaches against organizational context
                                            • Plan communication participation and feedback loops
                                            • Build capabilities and sequence learning needs
                                            • Align incentives controls and performance measures
                                            • Model financial operational and people trade-offs
                                            • Respond to a simulated failure or legitimacy challenge
                                            • Conduct an implementation review with dissent
                                            • Deliver a revised strategy-execution dossier

                                            Intended outcomes

                                            • Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions
                                            • Diagnose adoption barriers power and capability constraints using competing organizational explanations
                                            • Revise an implementation plan after a simulated setback while preserving accountability ethical boundaries and evaluation logic

                                            Prerequisites — historical references

                                            • strategy-analysis
                                              • Explain a strategic performance problem by connecting industry economics resources activities and stakeholder obligations
                                              • Compare at least three coherent strategic alternatives using financial operational and organizational evidence
                                              • Recommend a bounded strategic choice with explicit trade-offs disconfirming evidence and measurable assumptions
                                              Source outcomes: strategy-analysis.O1, strategy-analysis.O2, strategy-analysis.O3
                                            • human-resource-management
                                              • Translate an operating plan into a defensible workforce and job analysis with transparent assumptions
                                              • Compare selection development reward and performance approaches using validity fairness accessibility and incentive effects
                                              • Design an evidence-based people-process proposal with privacy boundaries escalation requirements and an evaluation plan
                                              Source outcomes: human-resource-management.O1, human-resource-management.O2, human-resource-management.O3
                                            • project-planning-delivery
                                              • Define project scope deliverables acceptance criteria and exclusions traceable to a stakeholder need
                                              • Produce a resource-constrained dependency schedule budget and risk register with a change-control rule
                                              • Respond to a simulated disruption and deliver an auditable acceptance handover with honest status and lessons
                                              Source outcomes: project-planning-delivery.O1, project-planning-delivery.O2, project-planning-delivery.O3

                                            Corequisites — historical references

                                            None listed in this historical profile.

                                            Entry competencies

                                              Planned project

                                              Implementation plan for a prior strategy case, assessed on new execution/change outcomes. Prior strategic-analysis work is referenced rather than resubmitted for duplicate credit.

                                              Existing supporting teaching

                                              Source limits

                                              Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                              • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                              • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                              Research Evidence & SynthesisPlanned · required · source semester 7

                                              Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                              Proposed room: Business hall · B-PLAN-28 — not built or assigned.

                                              Historical source ID: research-evidence-synthesis (reference only, not a new canonical ID)

                                              Basic aim — source outcome excerpt

                                              Construct a reproducible scoped search and appraisal protocol that identifies relevant contrary and missing evidence

                                              Planned outline — not authored lessons

                                              • Bound a review question and define eligible evidence
                                              • Build a search strategy and versioned search log
                                              • Screen records using explicit inclusion rules
                                              • Extract methods context outcomes and limitations
                                              • Appraise validity relevance and conflicts of interest
                                              • Compare effect measures and incompatible constructs
                                              • Detect duplicate datasets selective reporting and publication bias
                                              • Synthesize themes and quantitative patterns without unsupported pooling
                                              • Separate robust findings from context-specific claims
                                              • Develop a justified gap and proposed investigation
                                              • Respond to an adversarial methods critique
                                              • Deliver a reproducible review and management implication brief

                                              Intended outcomes

                                              • Construct a reproducible scoped search and appraisal protocol that identifies relevant contrary and missing evidence
                                              • Synthesize multiple studies by question design context and uncertainty without counting citations as independent proof
                                              • Produce a defensible evidence review and research gap statement that changes a managerial judgment proportionally to evidence

                                              Prerequisites — historical references

                                              • research-design-foundations
                                                • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                                                • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                                                • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision
                                                Source outcomes: research-design-foundations.O1, research-design-foundations.O2, research-design-foundations.O3
                                              • marketing-research
                                                • Design a fit-for-purpose customer inquiry with defensible population instrument sampling and ethics choices
                                                • Analyse synthetic quantitative and qualitative customer evidence while preserving uncertainty nonresponse and competing interpretations
                                                • Recommend a marketing decision whose strength is proportional to the evidence and specify a useful next experiment
                                                Source outcomes: marketing-research.O1, marketing-research.O2, marketing-research.O3
                                              • clear-writing
                                                • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
                                                • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
                                                • Deliver accessible written and oral-equivalent communication with traceable sources and a reasoned change log
                                                Source outcomes: clear-writing.O1, clear-writing.O2, clear-writing.O3

                                              Corequisites — historical references

                                              None listed in this historical profile.

                                              Entry competencies

                                                Planned project

                                                Original critical evidence review, approximately 2,500–3,500 words or accessible equivalent, with searchable ledger and appraisal matrices. No claim of a formal exhaustive systematic review.

                                                Existing supporting teaching

                                                Source limits

                                                Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                Procurement & Supply ChainsPlanned · required · source semester 7

                                                Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                Proposed room: Business hall · B-PLAN-29 — not built or assigned.

                                                Historical source ID: procurement-supply-chains (reference only, not a new canonical ID)

                                                Basic aim — source outcome excerpt

                                                Translate a service need into comparable specifications acceptance criteria and lifecycle-cost assumptions

                                                Planned outline — not authored lessons

                                                • Define demand scope and make-or-buy boundaries
                                                • Write comparable functional specifications
                                                • Separate must-have criteria from weighted preferences
                                                • Calculate lifecycle cost and financing implications
                                                • Analyse supplier capacity quality and delivery evidence
                                                • Map upstream dependencies and concentration risk
                                                • Compare network inventory and transport alternatives
                                                • Evaluate sourcing ethics and sustainability evidence
                                                • Draft negotiation objectives and contract-review questions
                                                • Design acceptance monitoring and supplier-development measures
                                                • Stress-test a supply interruption and recovery plan
                                                • Deliver a sourced procurement recommendation and audit trail

                                                Intended outcomes

                                                • Translate a service need into comparable specifications acceptance criteria and lifecycle-cost assumptions
                                                • Compare supplier and network alternatives using reliability capacity risk sustainability and financing effects
                                                • Design a proportionate sourcing and continuity plan with documented trade-offs controls and contract-review questions

                                                Prerequisites — historical references

                                                • operations-management
                                                  • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                                  • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                                                  • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls
                                                  Source outcomes: operations-management.O1, operations-management.O2, operations-management.O3
                                                • corporate-finance
                                                  • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                                                  • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                                                  Source outcomes: corporate-finance.O1, corporate-finance.O2
                                                • business-law-governance
                                                  • Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy
                                                  • Identify formation authority obligation remedy and risk-allocation questions in a fictional agreement without supplying a legal conclusion
                                                  • Compare governance roles accountability and internal control mechanisms and prepare a clear escalation brief for qualified review
                                                  Source outcomes: business-law-governance.O1, business-law-governance.O2, business-law-governance.O3

                                                Corequisites — historical references

                                                None listed in this historical profile.

                                                Entry competencies

                                                  Planned project

                                                  Three fictional supplier offers with noncomparable terms to normalize, a network model and continuity plan; no live procurement or contract execution.

                                                  Existing supporting teaching

                                                  Source limits

                                                  Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                  Business Risk & Internal ControlsPlanned · required · source semester 7

                                                  Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                  Proposed room: Business hall · B-PLAN-30 — not built or assigned.

                                                  Historical source ID: business-risk-controls (reference only, not a new canonical ID)

                                                  Basic aim — source outcome excerpt

                                                  Identify material strategic operational financial and information risks relative to objectives rather than an unbounded list

                                                  Planned outline — not authored lessons

                                                  • Frame objectives risk appetite and decision context
                                                  • Identify causes events consequences and dependencies
                                                  • Compare likelihood severity and uncertainty without false precision
                                                  • Map preventive detective and corrective controls
                                                  • Analyse fraud error and segregation-of-duty scenarios
                                                  • Evaluate liquidity concentration and counterparty exposure
                                                  • Examine information continuity and incident escalation
                                                  • Define control evidence sampling and test procedures
                                                  • Compare risk treatment transfer acceptance and avoidance
                                                  • Run an integrated stress scenario and response exercise
                                                  • Draft an assurance report with scope limitations
                                                  • Revise a risk-control system after a failed-control case

                                                  Intended outcomes

                                                  • Identify material strategic operational financial and information risks relative to objectives rather than an unbounded list
                                                  • Evaluate control design residual exposure and response choices using evidence thresholds and scenario analysis
                                                  • Produce a testable control and assurance plan that separates management responsibility independent review and unverified compliance claims

                                                  Prerequisites — historical references

                                                  • business-law-governance
                                                    • Locate and date authoritative jurisdiction-specific sources for a business issue and distinguish law guidance contract and ethical policy
                                                    • Identify formation authority obligation remedy and risk-allocation questions in a fictional agreement without supplying a legal conclusion
                                                    • Compare governance roles accountability and internal control mechanisms and prepare a clear escalation brief for qualified review
                                                    Source outcomes: business-law-governance.O1, business-law-governance.O2, business-law-governance.O3
                                                  • corporate-finance
                                                    • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                                                    • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                                                    Source outcomes: corporate-finance.O1, corporate-finance.O2
                                                  • quality-improvement
                                                    • Define quality outcome process and balancing measures with defensible units denominators and data-collection rules
                                                    • Distinguish common and special variation and appraise causal claims about an improvement using an appropriate comparison
                                                    • Design and evaluate a reversible improvement cycle that retains controls records adverse effects and supports revision
                                                    Source outcomes: quality-improvement.O1, quality-improvement.O2, quality-improvement.O3

                                                  Corequisites — historical references

                                                  None listed in this historical profile.

                                                  Entry competencies

                                                    Planned project

                                                    Fictional risk-control register, walkthrough evidence and simulated assurance report. No actual audit opinion or professional risk certification.

                                                    Existing supporting teaching

                                                    Source limits

                                                    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                    Business Improvement CapstonePlanned · required · source semester 8

                                                    Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                    Proposed room: Business hall · B-PLAN-31 — not built or assigned.

                                                    Historical source ID: business-improvement-capstone (reference only, not a new canonical ID)

                                                    Basic aim — source outcome excerpt

                                                    Frame and justify a bounded organizational improvement question with a feasible ethical protocol and an auditable evidence base

                                                    Planned outline — not authored lessons

                                                    • Approve a bounded question charter and exclusions through the proposed review gate
                                                    • Audit data rights quality provenance and method fitness
                                                    • Reconcile financial and operating baselines
                                                    • Analyse customer and organizational evidence with limitations
                                                    • Build alternative actions including the status quo
                                                    • Model cash capacity risk and stakeholder consequences
                                                    • Test sensitivity and disconfirming scenarios
                                                    • Design implementation resources controls and acceptance measures
                                                    • Specify evaluation indicators comparison logic and stop conditions
                                                    • Submit the integrated report and reproducible archive
                                                    • Complete an independent defense and rerun or retain self-review status
                                                    • Revise from criticism and deliver the final handover

                                                    Intended outcomes

                                                    • Frame and justify a bounded organizational improvement question with a feasible ethical protocol and an auditable evidence base
                                                    • Independently reconcile financial operational customer and organizational evidence and compare status quo plus at least two credible alternatives
                                                    • Defend revise and hand over a reproducible recommendation implementation plan and evaluation design with uncertainty and unresolved issues explicit

                                                    Prerequisites — historical references

                                                    • strategy-analysis
                                                      • Explain a strategic performance problem by connecting industry economics resources activities and stakeholder obligations
                                                      • Compare at least three coherent strategic alternatives using financial operational and organizational evidence
                                                      • Recommend a bounded strategic choice with explicit trade-offs disconfirming evidence and measurable assumptions
                                                      Source outcomes: strategy-analysis.O1, strategy-analysis.O2, strategy-analysis.O3
                                                    • strategic-implementation-change
                                                      • Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions
                                                      • Diagnose adoption barriers power and capability constraints using competing organizational explanations
                                                      • Revise an implementation plan after a simulated setback while preserving accountability ethical boundaries and evaluation logic
                                                      Source outcomes: strategic-implementation-change.O1, strategic-implementation-change.O2, strategic-implementation-change.O3
                                                    • research-evidence-synthesis
                                                      • Construct a reproducible scoped search and appraisal protocol that identifies relevant contrary and missing evidence
                                                      • Synthesize multiple studies by question design context and uncertainty without counting citations as independent proof
                                                      • Produce a defensible evidence review and research gap statement that changes a managerial judgment proportionally to evidence
                                                      Source outcomes: research-evidence-synthesis.O1, research-evidence-synthesis.O2, research-evidence-synthesis.O3
                                                    • procurement-supply-chains
                                                      • Translate a service need into comparable specifications acceptance criteria and lifecycle-cost assumptions
                                                      • Compare supplier and network alternatives using reliability capacity risk sustainability and financing effects
                                                      • Design a proportionate sourcing and continuity plan with documented trade-offs controls and contract-review questions
                                                      Source outcomes: procurement-supply-chains.O1, procurement-supply-chains.O2, procurement-supply-chains.O3
                                                    • business-risk-controls
                                                      • Identify material strategic operational financial and information risks relative to objectives rather than an unbounded list
                                                      • Evaluate control design residual exposure and response choices using evidence thresholds and scenario analysis
                                                      • Produce a testable control and assurance plan that separates management responsibility independent review and unverified compliance claims
                                                      Source outcomes: business-risk-controls.O1, business-risk-controls.O2, business-risk-controls.O3

                                                    Corequisites — historical references

                                                    None listed in this historical profile.

                                                    Entry competencies

                                                      Planned project

                                                      Harbour Repair Cooperative, retained from prior B16: 24-month synthetic repair case, approximately 1,200 jobs, linked accounts, three supplier offers and synthetic interviews. Dataset and reviewer service are still to be authored/secured. Deliver 4,000–6,000-word report or equivalent, two-page brief, tested workbook/notebook, sources, implementation/evaluation plan, defense and revision.

                                                      Existing supporting teaching

                                                      Source limits

                                                      Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                      • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                      • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                      • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                      Business Ethics & Public ValuePlanned · required · source semester 8

                                                      Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                      Proposed room: Business hall · B-PLAN-32 — not built or assigned.

                                                      Historical source ID: business-ethics-public-value (reference only, not a new canonical ID)

                                                      Basic aim — source outcome excerpt

                                                      Compare consequential rights duty virtue and justice arguments without treating one framework as an automatic answer

                                                      Planned outline — not authored lessons

                                                      • Distinguish legal compliance ethics and public value
                                                      • Compare consequences duties rights and justice lenses
                                                      • Map affected parties voice and unequal power
                                                      • Examine conflicts of interest and professional responsibility
                                                      • Analyse externalities public goods and collective action
                                                      • Evaluate fairness in pricing hiring and access decisions
                                                      • Examine technology data and automation accountability
                                                      • Compare shareholder stakeholder and cooperative governance arguments
                                                      • Assess public-private partnerships and mission drift
                                                      • Draft an ethical decision with serious counterarguments
                                                      • Conduct a deliberation seminar or accessible written dialogue
                                                      • Revise a public-value recommendation and accountability plan

                                                      Intended outcomes

                                                      • Compare consequential rights duty virtue and justice arguments without treating one framework as an automatic answer
                                                      • Diagnose conflicts among organizational viability stakeholder interests public value and distributions of harm
                                                      • Defend a feasible ethical recommendation with counterarguments decision accountability and transparent uncertainty

                                                      Prerequisites — historical references

                                                      • global-business-sustainability
                                                        • Analyse a cross-border business decision using trade institutions currency logistics and cultural assumptions with explicit geographic limits
                                                        • Compare environmental and social impacts across an operational boundary without shifting burdens invisibly
                                                        • Develop a feasible international or sustainability recommendation with source-traced claims scenario analysis and affected-stakeholder perspectives
                                                        Source outcomes: global-business-sustainability.O1, global-business-sustainability.O2, global-business-sustainability.O3
                                                      • business-risk-controls
                                                        • Identify material strategic operational financial and information risks relative to objectives rather than an unbounded list
                                                        • Evaluate control design residual exposure and response choices using evidence thresholds and scenario analysis
                                                        • Produce a testable control and assurance plan that separates management responsibility independent review and unverified compliance claims
                                                        Source outcomes: business-risk-controls.O1, business-risk-controls.O2, business-risk-controls.O3
                                                      • organizational-behaviour
                                                        • Compare at least two theories of motivation teams and organizational design against observed case evidence
                                                        • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
                                                        Source outcomes: organizational-behaviour.O1, organizational-behaviour.O2

                                                      Corequisites — historical references

                                                      None listed in this historical profile.

                                                      Entry competencies

                                                        Planned project

                                                        Original contested-management case portfolio with two opposed positions and a reasoned recommendation; does not assert institutional ethical certification.

                                                        Existing supporting teaching

                                                        Source limits

                                                        Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                        • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                        • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                        Management Communication & NegotiationPlanned · required · source semester 8

                                                        Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                        Proposed room: Business hall · B-PLAN-33 — not built or assigned.

                                                        Historical source ID: management-communication (reference only, not a new canonical ID)

                                                        Basic aim — source outcome excerpt

                                                        Translate a complex management analysis into accurate audience-specific written visual and oral-equivalent briefs

                                                        Planned outline — not authored lessons

                                                        • Analyse audience stakes authority and communication purpose
                                                        • Build an executive argument without concealing uncertainty
                                                        • Integrate numbers charts and accessible text
                                                        • Write a board-style decision paper with options and implications
                                                        • Prepare short spoken and written-equivalent briefings
                                                        • Distinguish negotiation positions interests and alternatives
                                                        • Establish reservation conditions and ethical boundaries
                                                        • Practise questioning listening and reframing using scripts
                                                        • Evaluate power multiparty interests and implementation risk
                                                        • Record a provisional agreement and verify meaning
                                                        • Defend a complex case under skeptical questioning
                                                        • Deliver a revised executive and negotiation portfolio

                                                        Intended outcomes

                                                        • Translate a complex management analysis into accurate audience-specific written visual and oral-equivalent briefs
                                                        • Prepare and conduct a scripted negotiation that distinguishes interests alternatives reservation conditions power and agreement verification
                                                        • Respond to critical questioning and disagreement with evidence-based revisions and a transparent record of unresolved issues

                                                        Prerequisites — historical references

                                                        • clear-writing
                                                          • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
                                                          • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
                                                          • Deliver accessible written and oral-equivalent communication with traceable sources and a reasoned change log
                                                          Source outcomes: clear-writing.O1, clear-writing.O2, clear-writing.O3
                                                        • organizational-behaviour
                                                          • Compare at least two theories of motivation teams and organizational design against observed case evidence
                                                          • Diagnose how roles incentives identity power and context jointly affect a workplace problem without inferring individual pathology
                                                          • Propose and critique a feasible team or organizational intervention with observable outcomes and an ethical boundary
                                                          Source outcomes: organizational-behaviour.O1, organizational-behaviour.O2, organizational-behaviour.O3
                                                        • strategic-implementation-change
                                                          • Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions
                                                          • Diagnose adoption barriers power and capability constraints using competing organizational explanations
                                                          • Revise an implementation plan after a simulated setback while preserving accountability ethical boundaries and evaluation logic
                                                          Source outcomes: strategic-implementation-change.O1, strategic-implementation-change.O2, strategic-implementation-change.O3

                                                        Corequisites — historical references

                                                        None listed in this historical profile.

                                                        Entry competencies

                                                          Planned project

                                                          Board paper, five-minute briefing/transcript and fictional negotiation record. Real counterpart contact is not required; simulated role responses remain labelled.

                                                          Existing supporting teaching

                                                          Source limits

                                                          Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                          • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                          • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                          • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                          Knowledge Management: Capture, Find & Share Know-howPlanned · required · source semester 8

                                                          Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                          Proposed room: Business hall · B-PLAN-34 — not built or assigned.

                                                          Historical source ID: knowledge-management (reference only, not a new canonical ID)

                                                          Basic aim — source outcome excerpt

                                                          Diagnose knowledge-flow failures by distinguishing explicit records tacit judgment context and feedback

                                                          Planned outline — not authored lessons

                                                          • Map explicit tacit and contextual knowledge needs
                                                          • Trace knowledge holders recipients and missing feedback
                                                          • Design capture interviews and observation protocols
                                                          • Separate evidence interpretation judgment cues and unknowns
                                                          • Build a task index metadata and controlled vocabulary
                                                          • Test retrieval against realistic questions and ambiguity
                                                          • Plan sharing communities and protected decision records
                                                          • Design continuity and exception handovers
                                                          • Assign curation review triggers retention and retirement rules
                                                          • Evaluate adoption findability and transfer measures
                                                          • Stress-test staff-transition and stale-information scenarios
                                                          • Deliver and revise a governed knowledge-handover system

                                                          Intended outcomes

                                                          • Diagnose knowledge-flow failures by distinguishing explicit records tacit judgment context and feedback
                                                          • Design and evaluate a maintainable capture retrieval sharing and continuity system with stewardship controls
                                                          • Deliver a tested organizational handover and learning plan whose performance claims distinguish simulation self-testing and observed use

                                                          Prerequisites — historical references

                                                          • information-systems-management
                                                            • Map a business information flow to data applications controls and stakeholder responsibilities
                                                            • Compare build buy integration and automation alternatives using lifecycle value reliability access and exit costs
                                                            • Design a governed digital-change proposal with testable requirements incident recovery and human decision boundaries
                                                            Source outcomes: information-systems-management.O1, information-systems-management.O2, information-systems-management.O3
                                                          • strategic-implementation-change
                                                            • Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions
                                                            • Diagnose adoption barriers power and capability constraints using competing organizational explanations
                                                            • Revise an implementation plan after a simulated setback while preserving accountability ethical boundaries and evaluation logic
                                                            Source outcomes: strategic-implementation-change.O1, strategic-implementation-change.O2, strategic-implementation-change.O3
                                                          • data-ethics-stewardship
                                                            • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                                                            • Design task-based access retention provenance and sharing controls with accountable role descriptions
                                                            Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2

                                                          Corequisites — historical references

                                                          None listed in this historical profile.

                                                          Entry competencies

                                                            Planned project

                                                            Advanced organizational knowledge-handover system extending the existing eight-lesson short course with governance evaluation and independent transfer evidence. No real staff assignment is created.

                                                            Existing supporting teaching

                                                            Source limits

                                                            Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                            • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                            • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                            Public Policy & the EconomyPlanned · candidate-elective · source eligible semesters 3

                                                            Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                            Proposed room: Business hall · B-PLAN-35 — not built or assigned.

                                                            Historical source ID: public-policy-economy (reference only, not a new canonical ID)

                                                            Basic aim — source outcome excerpt

                                                            Explain a public problem through market institutional and distributional mechanisms with competing interpretations

                                                            Planned outline — not authored lessons

                                                            • Define a public problem and affected populations
                                                            • Compare market and government failure arguments
                                                            • Examine taxation spending and distribution concepts
                                                            • Analyse regulation information and incentive instruments
                                                            • Interpret fiscal indicators with denominators and boundaries
                                                            • Compare social welfare measures and equity judgments
                                                            • Examine public goods and collective-action cases
                                                            • Evaluate a supplied policy study and causal limits
                                                            • Map implementation and administrative capacity
                                                            • Stress-test unintended consequences and alternatives
                                                            • Debate competing policy recommendations
                                                            • Revise a policy brief with explicit value judgments

                                                            Intended outcomes

                                                            • Explain a public problem through market institutional and distributional mechanisms with competing interpretations
                                                            • Compare policy instruments using incentives administrative feasibility fiscal effects and affected groups
                                                            • Write a source-traced policy brief that separates evidence value judgments and uncertainty

                                                            Prerequisites — historical references

                                                            • introductory-economics
                                                              • Explain a market change using demand supply elasticity opportunity cost and explicit ceteris-paribus assumptions
                                                              • Compare competition externalities public goods and policy responses while identifying distributional trade-offs
                                                              • Interpret output inflation employment interest and exchange-rate indicators and trace a plausible business transmission channel without claiming a forecast
                                                              Source outcomes: introductory-economics.O1, introductory-economics.O2, introductory-economics.O3
                                                            • evidence-sources
                                                              • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                                                              • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                                                              • Write a bounded evidence brief that documents search decisions, unsupported claims and a decision-changing information gap
                                                              Source outcomes: evidence-sources.O1, evidence-sources.O2, evidence-sources.O3

                                                            Corequisites — historical references

                                                            None listed in this historical profile.

                                                            Entry competencies

                                                              Planned project

                                                              Non-business breadth policy brief using current official public data or supplied snapshots, with source dates and two opposed arguments.

                                                              Existing supporting teaching

                                                              Source limits

                                                              Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                              • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                              • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                              Culture, Work & SocietyPlanned · candidate-elective · source eligible semesters 3

                                                              Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                              Proposed room: Business hall · B-PLAN-36 — not built or assigned.

                                                              Historical source ID: culture-work-society (reference only, not a new canonical ID)

                                                              Basic aim — source outcome excerpt

                                                              Compare sociological and historical explanations of work institutions identity and inequality without reducing groups to stereotypes

                                                              Planned outline — not authored lessons

                                                              • Distinguish social explanation from individual blame
                                                              • Examine changing divisions of work and care
                                                              • Compare institutions markets households and communities
                                                              • Read historical sources with context and missing voices
                                                              • Analyse class status power and occupational identity
                                                              • Examine gender race disability and intersecting barriers
                                                              • Compare formal and informal work arrangements
                                                              • Analyse technology surveillance and worker agency
                                                              • Evaluate globalization migration and workplace change
                                                              • Contrast competing explanations of a social case
                                                              • Discuss implications and limits for management decisions
                                                              • Submit a source-grounded social analysis and revision

                                                              Intended outcomes

                                                              • Compare sociological and historical explanations of work institutions identity and inequality without reducing groups to stereotypes
                                                              • Interpret primary and secondary sources with attention to context power and missing voices
                                                              • Develop a reasoned social analysis that challenges a management assumption and acknowledges interpretive limits

                                                              Prerequisites — historical references

                                                              • evidence-sources
                                                                • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                                                                • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                                                                • Write a bounded evidence brief that documents search decisions, unsupported claims and a decision-changing information gap
                                                                Source outcomes: evidence-sources.O1, evidence-sources.O2, evidence-sources.O3
                                                              • clear-writing
                                                                • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
                                                                • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
                                                                Source outcomes: clear-writing.O1, clear-writing.O2

                                                              Corequisites — historical references

                                                              None listed in this historical profile.

                                                              Entry competencies

                                                                Planned project

                                                                Non-business breadth essay or accessible equivalent based on an approved primary-source packet; no real-worker interviews required.

                                                                Existing supporting teaching

                                                                Source limits

                                                                Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                Environmental Systems & EvidencePlanned · candidate-elective · source eligible semesters 4

                                                                Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                Proposed room: Business hall · B-PLAN-37 — not built or assigned.

                                                                Historical source ID: environmental-systems (reference only, not a new canonical ID)

                                                                Basic aim — source outcome excerpt

                                                                Describe interacting energy material ecological and social systems using explicit boundaries stocks flows and feedback

                                                                Planned outline — not authored lessons

                                                                • Define system boundaries stocks flows and feedback
                                                                • Trace energy and material balances with units
                                                                • Examine populations ecosystems and biodiversity concepts
                                                                • Interpret water land and resource-use measures
                                                                • Distinguish weather climate variability and projections
                                                                • Analyse pollution pathways exposure and uncertainty
                                                                • Compare environmental datasets and spatial scales
                                                                • Model feedback delays and unintended consequences
                                                                • Evaluate mitigation adaptation and resource alternatives
                                                                • Examine fairness distribution and local context
                                                                • Critique a supplied environmental claim
                                                                • Revise an evidence-based systems report

                                                                Intended outcomes

                                                                • Describe interacting energy material ecological and social systems using explicit boundaries stocks flows and feedback
                                                                • Interpret environmental measurements uncertainty and scenario projections without substituting a model for observation
                                                                • Compare a bounded environmental action using trade-offs distribution and evidence-quality limits

                                                                Prerequisites — historical references

                                                                • algebra-functions
                                                                  • Translate a business quantity into an expression with units and domain restrictions and check equivalent forms
                                                                  • Solve and verify linear equations, inequalities and two-variable systems representing cost and capacity constraints
                                                                  Source outcomes: algebra-functions.O1, algebra-functions.O2
                                                                • introductory-statistics
                                                                  • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                                                                  • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                                                                  Source outcomes: introductory-statistics.O1, introductory-statistics.O2
                                                                • evidence-sources
                                                                  • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                                                                  • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                                                                  Source outcomes: evidence-sources.O1, evidence-sources.O2

                                                                Corequisites — historical references

                                                                None listed in this historical profile.

                                                                Entry competencies

                                                                  Planned project

                                                                  Non-business science breadth systems report on a supplied watershed or resource case; climate and environmental facts require current primary-source authoring review.

                                                                  Existing supporting teaching

                                                                  Source limits

                                                                  Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                  • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                  History of Technology & WorkPlanned · candidate-elective · source eligible semesters 4

                                                                  Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                  Proposed room: Business hall · B-PLAN-38 — not built or assigned.

                                                                  Historical source ID: history-technology-work (reference only, not a new canonical ID)

                                                                  Basic aim — source outcome excerpt

                                                                  Explain technological change through historical contingency institutions labour and material constraints rather than inevitable progress

                                                                  Planned outline — not authored lessons

                                                                  • Ask a bounded historical question about technology and work
                                                                  • Establish chronology provenance and source context
                                                                  • Compare artisan household and factory production
                                                                  • Examine infrastructure standards and network adoption
                                                                  • Analyse labour organization skills and conflict
                                                                  • Explore gender colonialism and uneven technology access
                                                                  • Compare management practices and measurement regimes
                                                                  • Examine automation rhetoric against historical evidence
                                                                  • Trace environmental and social consequences
                                                                  • Test a present-day analogy against historical differences
                                                                  • Discuss alternative interpretations and missing voices
                                                                  • Submit an original historical argument and source dossier

                                                                  Intended outcomes

                                                                  • Explain technological change through historical contingency institutions labour and material constraints rather than inevitable progress
                                                                  • Compare primary sources with conflicting perspectives and document provenance context and silences
                                                                  • Develop a historical argument that distinguishes analogy from evidence about a present management question

                                                                  Prerequisites — historical references

                                                                  • evidence-sources
                                                                    • Trace at least eight material claims to dated original evidence and distinguish observation, inference and recommendation
                                                                    • Compare conflicting sources using relevance, methods, provenance and uncertainty rather than source prestige alone
                                                                    • Write a bounded evidence brief that documents search decisions, unsupported claims and a decision-changing information gap
                                                                    Source outcomes: evidence-sources.O1, evidence-sources.O2, evidence-sources.O3
                                                                  • clear-writing
                                                                    • Produce an audience-specific analytical memo with a clear claim, warranted evidence and actionable limits
                                                                    • Revise a document in response to conflicting reader feedback while preserving factual and numerical meaning
                                                                    • Deliver accessible written and oral-equivalent communication with traceable sources and a reasoned change log
                                                                    Source outcomes: clear-writing.O1, clear-writing.O2, clear-writing.O3

                                                                  Corequisites — historical references

                                                                  None listed in this historical profile.

                                                                  Entry competencies

                                                                    Planned project

                                                                    Non-business humanities breadth essay and annotated primary-source dossier; existing cultural short courses may inform source literacy but do not automatically satisfy this profile.

                                                                    Existing supporting teaching

                                                                    Source limits

                                                                    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                    Data Cleaning & ProvenancePlanned · candidate-elective · source eligible semesters 5

                                                                    Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                    Proposed room: Business hall · B-PLAN-39 — not built or assigned.

                                                                    Historical source ID: data-cleaning-provenance (reference only, not a new canonical ID)

                                                                    Basic aim — source outcome excerpt

                                                                    Diagnose schema missingness duplication linkage and validity defects relative to a stated analysis question

                                                                    Planned outline — not authored lessons

                                                                    • Define an analysis-ready schema and quality contract
                                                                    • Profile types ranges units and missingness
                                                                    • Identify duplicate keys and ambiguous record linkage
                                                                    • Separate corrections exclusions and imputation
                                                                    • Normalize dates categories and measurement units
                                                                    • Reconcile joins against row and value controls
                                                                    • Write reversible transformation steps and tests
                                                                    • Track provenance versions permissions and data dictionaries
                                                                    • Compare alternative missing-data treatments
                                                                    • Quantify effects of cleaning choices on conclusions
                                                                    • Conduct an independent rerun or labelled self-reproduction
                                                                    • Release a clean synthetic dataset and defect register

                                                                    Intended outcomes

                                                                    • Diagnose schema missingness duplication linkage and validity defects relative to a stated analysis question
                                                                    • Implement reversible cleaning transformations with row-level provenance control totals and tested invariants
                                                                    • Quantify sensitivity to unresolved data choices and deliver a reproducible dataset release with rights and limitations

                                                                    Prerequisites — historical references

                                                                    • relational-data-sql
                                                                      • Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain
                                                                      • Write and validate selection join aggregate and subquery operations against known control cases
                                                                      • Deliver a reproducible query analysis that preserves provenance access limits missingness and reconciliation to source totals
                                                                      Source outcomes: relational-data-sql.O1, relational-data-sql.O2, relational-data-sql.O3
                                                                    • introductory-statistics
                                                                      • Define population sample unit variables and missingness rules and produce accurate descriptive comparisons
                                                                      • Calculate conditional probabilities intervals and introductory tests with assumptions and practical-importance interpretation
                                                                      Source outcomes: introductory-statistics.O1, introductory-statistics.O2
                                                                    • data-ethics-stewardship
                                                                      • Justify or remove each field in a proposed collection using purpose necessity and contextual identifiability
                                                                      • Design task-based access retention provenance and sharing controls with accountable role descriptions
                                                                      Source outcomes: data-ethics-stewardship.O1, data-ethics-stewardship.O2

                                                                    Corequisites — historical references

                                                                    None listed in this historical profile.

                                                                    Entry competencies

                                                                      Planned project

                                                                      Synthetic multi-table repair dataset with defects, transformation script or auditable workbook, tests, lineage and a sensitivity report. Retains prior unreserved extension ID.

                                                                      Existing supporting teaching

                                                                      Source limits

                                                                      Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                      • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                      • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                      • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                      Entrepreneurship & Venture ExperimentsPlanned · candidate-elective · source eligible semesters 5

                                                                      Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                      Proposed room: Business hall · B-PLAN-40 — not built or assigned.

                                                                      Historical source ID: entrepreneurship-experiments (reference only, not a new canonical ID)

                                                                      Basic aim — source outcome excerpt

                                                                      Identify a bounded venture opportunity and distinguish problem evidence from founder assumptions

                                                                      Planned outline — not authored lessons

                                                                      • Identify an opportunity and falsifiable problem claims
                                                                      • Map customer user payer and alternative solutions
                                                                      • Develop competing value propositions
                                                                      • Connect channels revenue delivery and key resources
                                                                      • Calculate contribution acquisition cost and break-even
                                                                      • Model cash runway and capacity constraints
                                                                      • Identify ethical and accessibility boundaries
                                                                      • Prioritize assumptions by consequence and uncertainty
                                                                      • Design small experiments with stop rules
                                                                      • Interpret synthetic test results and contradictory evidence
                                                                      • Compare continuation pivot and stopping options
                                                                      • Defend a revised venture experiment portfolio

                                                                      Intended outcomes

                                                                      • Identify a bounded venture opportunity and distinguish problem evidence from founder assumptions
                                                                      • Compare business-model alternatives using unit economics capacity cash and stakeholder constraints
                                                                      • Design and interpret low-risk synthetic venture tests and decide whether to continue adapt or stop

                                                                      Prerequisites — historical references

                                                                      • marketing-foundations
                                                                        • Define a defensible customer segment and value proposition using evidence that separates needs from unsupported personas
                                                                        • Compare product pricing channel and communication choices for consistency with margin capacity and customer access
                                                                        • Design a measurement plan that distinguishes reach acquisition retention contribution and causal impact
                                                                        Source outcomes: marketing-foundations.O1, marketing-foundations.O2, marketing-foundations.O3
                                                                      • managerial-accounting
                                                                        • Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records
                                                                        • Compare relevant-cost volume-profit budget and variance analyses without treating sunk costs as avoidable
                                                                        Source outcomes: managerial-accounting.O1, managerial-accounting.O2
                                                                      • research-design-foundations
                                                                        • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                                                                        • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                                                                        • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision
                                                                        Source outcomes: research-design-foundations.O1, research-design-foundations.O2, research-design-foundations.O3

                                                                      Corequisites — historical references

                                                                      None listed in this historical profile.

                                                                      Entry competencies

                                                                        Planned project

                                                                        Fictional venture experiment portfolio with three tests and unit-economics workbook; no public launch, payment, recruitment or business registration.

                                                                        Existing supporting teaching

                                                                        Source limits

                                                                        Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                        • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                        • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                        • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                        Financial Statement AnalysisPlanned · candidate-elective · source eligible semesters 6

                                                                        Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                        Proposed room: Business hall · B-PLAN-41 — not built or assigned.

                                                                        Historical source ID: financial-statement-analysis (reference only, not a new canonical ID)

                                                                        Basic aim — source outcome excerpt

                                                                        Reconcile financial statements notes and cash flows and identify accounting choices that affect comparability

                                                                        Planned outline — not authored lessons

                                                                        • Audit statement links and reporting boundaries
                                                                        • Read notes policies estimates and contingencies
                                                                        • Normalize comparative statements cautiously
                                                                        • Analyse margins asset turnover and returns
                                                                        • Evaluate liquidity cash conversion and working capital
                                                                        • Examine leverage coverage and financing constraints
                                                                        • Diagnose accrual cash and earnings-quality signals
                                                                        • Compare segment and peer performance with context
                                                                        • Build a driver-based forecast with reconciliation
                                                                        • Estimate valuation ranges rather than precise targets
                                                                        • Stress-test accounting and operating assumptions
                                                                        • Deliver a source-traced financial analysis and limitations

                                                                        Intended outcomes

                                                                        • Reconcile financial statements notes and cash flows and identify accounting choices that affect comparability
                                                                        • Decompose profitability liquidity leverage and working-capital changes using coherent ratios and business context
                                                                        • Build and critique a bounded valuation or credit scenario with sensitivity and clear limits

                                                                        Prerequisites — historical references

                                                                        • corporate-finance
                                                                          • Value a dated stream of cash flows with explicit discount-rate timing and inflation assumptions
                                                                          • Compare investment and financing alternatives using incremental cash flow risk sensitivity and working-capital effects
                                                                          • Explain how capital structure payout and governance choices allocate risk without presenting model outputs as investment advice
                                                                          Source outcomes: corporate-finance.O1, corporate-finance.O2, corporate-finance.O3
                                                                        • managerial-accounting
                                                                          • Classify and allocate costs using an explicit decision purpose and reconcile totals to the underlying records
                                                                          • Compare relevant-cost volume-profit budget and variance analyses without treating sunk costs as avoidable
                                                                          • Recommend a management control with behavioural consequences and sensitivity to uncertain demand
                                                                          Source outcomes: managerial-accounting.O1, managerial-accounting.O2, managerial-accounting.O3
                                                                        • accounting-foundations
                                                                          • Record a supplied transaction set using the accounting equation and double entry, with every journal entry balanced
                                                                          • Reconcile ledger balances to a trial balance and resolve a bank difference using an evidence trail
                                                                          • Produce linked introductory income, financial-position and cash summaries after justified period-end adjustments and explain cash-profit differences
                                                                          Source outcomes: accounting-foundations.O1, accounting-foundations.O2, accounting-foundations.O3

                                                                        Corequisites — historical references

                                                                        None listed in this historical profile.

                                                                        Entry competencies

                                                                          Planned project

                                                                          Synthetic or approved historical public statements with a reconciled analysis workbook; educational company analysis, not a personalized trade recommendation.

                                                                          Existing supporting teaching

                                                                          Source limits

                                                                          Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                          • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                          • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                          • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                          Service Design & AccessibilityPlanned · candidate-elective · source eligible semesters 6

                                                                          Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                          Proposed room: Business hall · B-PLAN-42 — not built or assigned.

                                                                          Historical source ID: service-design-accessibility (reference only, not a new canonical ID)

                                                                          Basic aim — source outcome excerpt

                                                                          Map an evidence-grounded service journey and blueprint that distinguishes observed barriers from assumptions

                                                                          Planned outline — not authored lessons

                                                                          • Define a service boundary and user tasks
                                                                          • Review customer evidence and excluded perspectives
                                                                          • Map journeys touchpoints waits and recovery
                                                                          • Build a frontstage-backstage service blueprint
                                                                          • Identify accessibility barriers and alternative routes
                                                                          • Write measurable requirements and acceptance conditions
                                                                          • Generate low-fidelity service alternatives
                                                                          • Compare cost capacity and stakeholder trade-offs
                                                                          • Prototype instructions forms and handoffs
                                                                          • Run scripted accessibility and task-completion checks
                                                                          • Revise from test evidence and unresolved issues
                                                                          • Deliver a service-design dossier and maintenance plan

                                                                          Intended outcomes

                                                                          • Map an evidence-grounded service journey and blueprint that distinguishes observed barriers from assumptions
                                                                          • Translate accessibility and service requirements into testable alternatives with delivery and resource implications
                                                                          • Evaluate a prototype with explicitly labelled scripted tests and revise it without inventing user validation

                                                                          Prerequisites — historical references

                                                                          • marketing-research
                                                                            • Design a fit-for-purpose customer inquiry with defensible population instrument sampling and ethics choices
                                                                            • Analyse synthetic quantitative and qualitative customer evidence while preserving uncertainty nonresponse and competing interpretations
                                                                            • Recommend a marketing decision whose strength is proportional to the evidence and specify a useful next experiment
                                                                            Source outcomes: marketing-research.O1, marketing-research.O2, marketing-research.O3
                                                                          • operations-management
                                                                            • Map a process and reconcile capacity throughput utilization waiting and work measures using consistent boundaries
                                                                            • Compare inventory scheduling and service-capacity policies under uncertain demand and resource constraints
                                                                            • Recommend an operational redesign with cost service risk and balancing measures that preserves necessary controls
                                                                            Source outcomes: operations-management.O1, operations-management.O2, operations-management.O3
                                                                          • project-planning-delivery
                                                                            • Define project scope deliverables acceptance criteria and exclusions traceable to a stakeholder need
                                                                            • Produce a resource-constrained dependency schedule budget and risk register with a change-control rule
                                                                            Source outcomes: project-planning-delivery.O1, project-planning-delivery.O2

                                                                          Corequisites — historical references

                                                                          None listed in this historical profile.

                                                                          Entry competencies

                                                                            Planned project

                                                                            Original service blueprint and paper/local prototype with text alternatives and scripted evaluation; no browser account changes, campus geometry, residence or teacher tools.

                                                                            Existing supporting teaching

                                                                            Source limits

                                                                            Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                            • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                            • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                            People Analytics & EvaluationPlanned · candidate-elective · source eligible semesters 7

                                                                            Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                            Proposed room: Business hall · B-PLAN-43 — not built or assigned.

                                                                            Historical source ID: people-analytics (reference only, not a new canonical ID)

                                                                            Basic aim — source outcome excerpt

                                                                            Define a legitimate workforce question with privacy-proportionate measures and explicit fairness risks

                                                                            Planned outline — not authored lessons

                                                                            • Bound workforce decisions and legitimate data purposes
                                                                            • Specify constructs measures and contextual limitations
                                                                            • Audit synthetic workforce data and access risks
                                                                            • Analyse hiring retention development and mobility patterns
                                                                            • Distinguish group patterns from individual predictions
                                                                            • Compare fairness measures and conflicting criteria
                                                                            • Diagnose selection attrition and measurement bias
                                                                            • Design an intervention and comparison strategy
                                                                            • Estimate uncertainty and heterogeneous effects cautiously
                                                                            • Stress-test incentives and unintended consequences
                                                                            • Prepare a governance and stakeholder challenge review
                                                                            • Deliver an ethical people-analytics evaluation

                                                                            Intended outcomes

                                                                            • Define a legitimate workforce question with privacy-proportionate measures and explicit fairness risks
                                                                            • Analyse synthetic workforce data with missingness selection and causal limitations documented
                                                                            • Evaluate a people intervention using defensible metrics and safeguards against discriminatory or unjustified individual decisions

                                                                            Prerequisites — historical references

                                                                            • human-resource-management
                                                                              • Translate an operating plan into a defensible workforce and job analysis with transparent assumptions
                                                                              • Compare selection development reward and performance approaches using validity fairness accessibility and incentive effects
                                                                              • Design an evidence-based people-process proposal with privacy boundaries escalation requirements and an evaluation plan
                                                                              Source outcomes: human-resource-management.O1, human-resource-management.O2, human-resource-management.O3
                                                                            • research-design-foundations
                                                                              • Translate a management question into a measurable estimand and a defensible sampling or comparison design
                                                                              • Distinguish random sampling assignment confounding measurement error and attrition and assess threats to inference
                                                                              • Produce a reproducible research protocol with instrument pilot analysis plan ethics boundaries and an explicit feasibility decision
                                                                              Source outcomes: research-design-foundations.O1, research-design-foundations.O2, research-design-foundations.O3
                                                                            • relational-data-sql
                                                                              • Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain
                                                                              • Write and validate selection join aggregate and subquery operations against known control cases
                                                                              • Deliver a reproducible query analysis that preserves provenance access limits missingness and reconciliation to source totals
                                                                              Source outcomes: relational-data-sql.O1, relational-data-sql.O2, relational-data-sql.O3

                                                                            Corequisites — historical references

                                                                            None listed in this historical profile.

                                                                            Entry competencies

                                                                              Planned project

                                                                              Synthetic workforce evaluation with no protected-trait inference about real people, individual employment decisions or real personnel records.

                                                                              Existing supporting teaching

                                                                              Source limits

                                                                              Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                              • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                              • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                              • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                              Business Analytics & Decision ModelsPlanned · candidate-elective · source eligible semesters 7

                                                                              Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                              Proposed room: Business hall · B-PLAN-44 — not built or assigned.

                                                                              Historical source ID: advanced-business-analytics (reference only, not a new canonical ID)

                                                                              Basic aim — source outcome excerpt

                                                                              Formulate an operational decision as a constrained optimization forecast or simulation problem with defensible assumptions

                                                                              Planned outline — not authored lessons

                                                                              • Choose a decision-model family from the question
                                                                              • Audit data leakage grain and temporal ordering
                                                                              • Build and compare transparent forecast baselines
                                                                              • Validate errors using held-out synthetic periods
                                                                              • Formulate linear decision variables constraints and objectives
                                                                              • Solve a small resource-allocation problem
                                                                              • Interpret shadow-price and constraint sensitivity conceptually
                                                                              • Simulate uncertain demand costs and failures
                                                                              • Compare risk return service and robustness criteria
                                                                              • Test model drift incentives and human override needs
                                                                              • Reproduce the analysis from raw inputs
                                                                              • Defend a decision model and operating-monitoring plan

                                                                              Intended outcomes

                                                                              • Formulate an operational decision as a constrained optimization forecast or simulation problem with defensible assumptions
                                                                              • Validate model performance and uncertainty using holdouts baseline comparisons sensitivity and error costs
                                                                              • Recommend an implementable model-supported action with human oversight reproducibility and limits on extrapolation

                                                                              Prerequisites — historical references

                                                                              • managerial-economics
                                                                                • Estimate and critique demand and cost relationships using supplied data with identification limits stated
                                                                                • Compare constrained pricing entry and competitive-response choices using marginal reasoning and scenario analysis
                                                                                • Explain how contracts incentives and information asymmetry alter a decision and test assumptions that reverse the preferred option
                                                                                Source outcomes: managerial-economics.O1, managerial-economics.O2, managerial-economics.O3
                                                                              • relational-data-sql
                                                                                • Model entities keys relationships and integrity constraints without duplicate facts or ambiguous grain
                                                                                • Write and validate selection join aggregate and subquery operations against known control cases
                                                                                • Deliver a reproducible query analysis that preserves provenance access limits missingness and reconciliation to source totals
                                                                                Source outcomes: relational-data-sql.O1, relational-data-sql.O2, relational-data-sql.O3
                                                                              • quality-improvement
                                                                                • Define quality outcome process and balancing measures with defensible units denominators and data-collection rules
                                                                                • Distinguish common and special variation and appraise causal claims about an improvement using an appropriate comparison
                                                                                • Design and evaluate a reversible improvement cycle that retains controls records adverse effects and supports revision
                                                                                Source outcomes: quality-improvement.O1, quality-improvement.O2, quality-improvement.O3

                                                                              Corequisites — historical references

                                                                              None listed in this historical profile.

                                                                              Entry competencies

                                                                                Planned project

                                                                                Reproducible forecast/optimization/simulation project using spreadsheet or SQL-supported workflows; programming is optional and no unlisted coding prerequisite is hidden.

                                                                                Existing supporting teaching

                                                                                • Introductory Statistics — Existing teaching / preparation only; not completion of this planned semester profile
                                                                                • Spreadsheet Foundations — Existing teaching / preparation only; not completion of this planned semester profile
                                                                                • Algebra & Functions — Existing teaching / preparation only; not completion of this planned semester profile

                                                                                Source limits

                                                                                Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                                • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                                Innovation & Product ManagementPlanned · candidate-elective · source eligible semesters 8

                                                                                Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                                Proposed room: Business hall · B-PLAN-45 — not built or assigned.

                                                                                Historical source ID: innovation-product-management (reference only, not a new canonical ID)

                                                                                Basic aim — source outcome excerpt

                                                                                Compare innovation opportunities against strategy customer evidence feasibility and portfolio constraints

                                                                                Planned outline — not authored lessons

                                                                                • Define innovation scope and strategic intent
                                                                                • Map user problems substitutes and unmet evidence needs
                                                                                • Compare incremental architectural and model innovations
                                                                                • Assess technical operational and organizational feasibility
                                                                                • Prioritize a portfolio under resource constraints
                                                                                • Specify a product outcome and experiment roadmap
                                                                                • Model unit economics adoption and support costs
                                                                                • Design accessibility and responsible-use requirements
                                                                                • Plan staged launch feedback and rollback
                                                                                • Compare synthetic adoption and retention evidence
                                                                                • Decide continue revise or retire under changed conditions
                                                                                • Deliver an innovation portfolio and lifecycle recommendation

                                                                                Intended outcomes

                                                                                • Compare innovation opportunities against strategy customer evidence feasibility and portfolio constraints
                                                                                • Design a product or service roadmap whose prioritization assumptions and experiment criteria are explicit
                                                                                • Evaluate launch and lifecycle scenarios and recommend continuation revision or retirement with responsible stakeholder effects

                                                                                Prerequisites — historical references

                                                                                • strategy-analysis
                                                                                  • Explain a strategic performance problem by connecting industry economics resources activities and stakeholder obligations
                                                                                  • Compare at least three coherent strategic alternatives using financial operational and organizational evidence
                                                                                  • Recommend a bounded strategic choice with explicit trade-offs disconfirming evidence and measurable assumptions
                                                                                  Source outcomes: strategy-analysis.O1, strategy-analysis.O2, strategy-analysis.O3
                                                                                • marketing-research
                                                                                  • Design a fit-for-purpose customer inquiry with defensible population instrument sampling and ethics choices
                                                                                  • Analyse synthetic quantitative and qualitative customer evidence while preserving uncertainty nonresponse and competing interpretations
                                                                                  • Recommend a marketing decision whose strength is proportional to the evidence and specify a useful next experiment
                                                                                  Source outcomes: marketing-research.O1, marketing-research.O2, marketing-research.O3
                                                                                • strategic-implementation-change
                                                                                  • Translate a chosen strategy into connected workstreams decision rights resources and measurable assumptions
                                                                                  • Diagnose adoption barriers power and capability constraints using competing organizational explanations
                                                                                  • Revise an implementation plan after a simulated setback while preserving accountability ethical boundaries and evaluation logic
                                                                                  Source outcomes: strategic-implementation-change.O1, strategic-implementation-change.O2, strategic-implementation-change.O3

                                                                                Corequisites — historical references

                                                                                None listed in this historical profile.

                                                                                Entry competencies

                                                                                  Planned project

                                                                                  Fictional service/product roadmap, evidence register, portfolio model and staged experiment plan; no actual launch or claims of user validation.

                                                                                  Existing supporting teaching

                                                                                  Source limits

                                                                                  Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                                  • U1: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                  • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                  • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.
                                                                                  Public & Social Program EvaluationPlanned · candidate-elective · source eligible semesters 8

                                                                                  Planning scope only. Reconcile shared identities and reserved authors before any teaching or curriculum merge.

                                                                                  Proposed room: Business hall · B-PLAN-46 — not built or assigned.

                                                                                  Historical source ID: public-program-evaluation (reference only, not a new canonical ID)

                                                                                  Basic aim — source outcome excerpt

                                                                                  Develop a program logic model linking resources activities outputs outcomes and plausible competing mechanisms

                                                                                  Planned outline — not authored lessons

                                                                                  • Define a public or social program and its decision owner
                                                                                  • Build a theory of change with external assumptions
                                                                                  • Separate inputs activities outputs outcomes and impacts
                                                                                  • Design process and implementation measures
                                                                                  • Choose a credible impact comparison and limitations
                                                                                  • Assess data access consent and distributional burdens
                                                                                  • Compare cost-effectiveness and cost-benefit concepts
                                                                                  • Analyse synthetic outcomes attrition and uncertainty
                                                                                  • Examine heterogeneous effects and unintended consequences
                                                                                  • Integrate quantitative qualitative and implementation evidence
                                                                                  • Challenge a continuation or stopping recommendation
                                                                                  • Deliver an evaluation report and accountable learning plan

                                                                                  Intended outcomes

                                                                                  • Develop a program logic model linking resources activities outputs outcomes and plausible competing mechanisms
                                                                                  • Compare process impact and economic evaluation designs with feasibility distribution and ethical constraints
                                                                                  • Analyse supplied program evidence and recommend continuation adaptation or stopping without claiming unidentified causal effects

                                                                                  Prerequisites — historical references

                                                                                  • research-evidence-synthesis
                                                                                    • Construct a reproducible scoped search and appraisal protocol that identifies relevant contrary and missing evidence
                                                                                    • Synthesize multiple studies by question design context and uncertainty without counting citations as independent proof
                                                                                    • Produce a defensible evidence review and research gap statement that changes a managerial judgment proportionally to evidence
                                                                                    Source outcomes: research-evidence-synthesis.O1, research-evidence-synthesis.O2, research-evidence-synthesis.O3
                                                                                  • quality-improvement
                                                                                    • Define quality outcome process and balancing measures with defensible units denominators and data-collection rules
                                                                                    • Distinguish common and special variation and appraise causal claims about an improvement using an appropriate comparison
                                                                                    • Design and evaluate a reversible improvement cycle that retains controls records adverse effects and supports revision
                                                                                    Source outcomes: quality-improvement.O1, quality-improvement.O2, quality-improvement.O3
                                                                                  • global-business-sustainability
                                                                                    • Analyse a cross-border business decision using trade institutions currency logistics and cultural assumptions with explicit geographic limits
                                                                                    • Compare environmental and social impacts across an operational boundary without shifting burdens invisibly
                                                                                    • Develop a feasible international or sustainability recommendation with source-traced claims scenario analysis and affected-stakeholder perspectives
                                                                                    Source outcomes: global-business-sustainability.O1, global-business-sustainability.O2, global-business-sustainability.O3

                                                                                  Corequisites — historical references

                                                                                  None listed in this historical profile.

                                                                                  Entry competencies

                                                                                    Planned project

                                                                                    Synthetic public or social program evaluation with explicit counterfactual limits and distributional analysis; no actual participant research or public funding decision.

                                                                                    Existing supporting teaching

                                                                                    Source limits

                                                                                    Recovered release185 planning map. Outcomes, weeks, cases and assessment designs are proposals, not externally validated syllabi. Old availability flags and identity decisions are not applied.

                                                                                    • U2: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                    • U3: Broad curriculum architecture or elective breadth/depth benchmark; all specific outcomes, weeks, cases, weights and hours are original design judgments, not copied university syllabi.
                                                                                    • P1: Continue stable course identities, progression gates, source stewardship, original assessment and Harbour Repair capstone where relevant; update prior scope explicitly.