{
  "schema": 1,
  "id": "business-foundations-product",
  "title": "Ridge Modular Kits: fictional product evidence pack",
  "version": "1.0",
  "currency": "CAD",
  "period": "One invented 30-day operating month",
  "status": "Original synthetic teaching fixture; not collected market evidence, a forecast or a real offer.",
  "decision": "Recommend whether to retain the direct product model, prefer the pop-up scenario, or revise/defer the proposed operation under the supplied stock, capacity and cash constraints.",
  "business": {
    "user": "Participant arranging a small tabletop planting activity",
    "payer": "Participant or community-club purchasing coordinator; these may differ",
    "problem": "Assembling a consistent set of activity components can be inconvenient; some users already have suitable containers and prefer flexibility.",
    "offer": "One modular planter kit with the listed reusable containers, connectors and printed assembly guide. It excludes plants, soil, tools, installation and delivery. No claim is supplied about environmental advantage, plant growth or safety beyond the fictional activity specification.",
    "alternatives": [
      "Reuse containers already held and follow an existing free activity guide.",
      "Buy separate components from a supplied generic shop alternative; no actual retailer or market price is asserted.",
      "Share a club-owned kit or simplify the activity."
    ],
    "scope_note": "This is a fictional product case, not horticultural, product-safety or legal advice."
  },
  "observations": [
    {
      "id": "P1",
      "type": "synthetic user notes",
      "facts": "Ten invented activity profiles were supplied: six like having matching components, three prefer reusing existing containers and one gives no preference.",
      "interpretation_limit": "Preference for matching components is not a priced purchase or proof of recurring demand."
    },
    {
      "id": "P2",
      "type": "synthetic user details",
      "records": [
        {
          "profile": "K1",
          "note": "Values a complete set but has limited storage."
        },
        {
          "profile": "K2",
          "note": "Likes matching components but wants plants included."
        },
        {
          "profile": "K3",
          "note": "Likes the guide and would share a kit with a club."
        },
        {
          "profile": "K4",
          "note": "Needs a manageable carrying size."
        },
        {
          "profile": "K5",
          "note": "Likes a fixed component list for planning."
        },
        {
          "profile": "K6",
          "note": "Would compare the full price with separate parts."
        },
        {
          "profile": "K7",
          "note": "Existing containers already meet the need."
        },
        {
          "profile": "K8",
          "note": "Prefers a free guide and reused containers."
        },
        {
          "profile": "K9",
          "note": "Wants freedom to choose sizes separately."
        },
        {
          "profile": "K10",
          "note": "No preference supplied."
        }
      ],
      "interpretation_limit": "K1–K6 correspond to the six positive-preference profiles in P1; they are not additional people."
    },
    {
      "id": "P3",
      "type": "synthetic priced-choice record",
      "facts": "Six supplied profiles viewed the CAD48 offer: two selected the kit, three selected reuse/separate parts and one deferred pending a club decision. No payment was collected.",
      "interpretation_limit": "These are simulated selections, not sales. The reason for each non-selection is not fully supplied."
    },
    {
      "id": "P4",
      "type": "synthetic payer note",
      "facts": "A club coordinator likes a standardized component list but requests an invoice after delivery. An individual-payer profile prefers immediate payment once contents and collection are confirmed.",
      "interpretation_limit": "The two roles suggest different timing needs; they do not establish the share of the market in either group."
    },
    {
      "id": "P5",
      "type": "synthetic channel log",
      "facts": "A sample board has twelve favourite events, six price-request events and two paid sample orders under separate sample terms. Identities, overlap, exposure counts and sample prices are not supplied. These sample orders are not part of the monthly financial fixture.",
      "interpretation_limit": "Do not add twenty events as twenty customers, calculate conversion, or include sample receipts in the operating month."
    },
    {
      "id": "P6",
      "type": "synthetic production observation",
      "facts": "Three timed assembly trials took 27, 31 and 32 minutes per kit including packing. The planning allowance is 30 minutes and forty production hours are available, giving eighty-kit capacity. Space for no more than twenty unsold finished kits is supplied.",
      "interpretation_limit": "The observed average is30 minutes for these three trials, not proof of reliability or a real-world standard."
    },
    {
      "id": "P7",
      "type": "synthetic pickup/access note",
      "facts": "Two profile notes ask for a clearer collection window. One user profile reports that a large bundle would be awkward to carry. No delivery vehicle or home-delivery labour is supplied.",
      "interpretation_limit": "Adding free home delivery would require new resource and cost assumptions."
    },
    {
      "id": "P8",
      "type": "synthetic pop-up proposal",
      "facts": "A local-room role-play proposes a single-month pop-up at CAD44 with extra handling cost, higher fixed cost and immediate payment. Seventy-five delivered units are a supplied scenario, not confirmed orders.",
      "interpretation_limit": "The scenario volume must not be described as measured demand. Pop-up access may help some users and inconvenience others."
    },
    {
      "id": "P9",
      "type": "synthetic supplier change",
      "facts": "For the change case only, a fictional supplier raises unit materials cost by CAD4. All other quantities, price, fixed cost and payment timings remain as in the direct base case.",
      "interpretation_limit": "Apply the cost increase consistently to delivered units and unsold stock. Do not assume customers accept a price rise."
    },
    {
      "id": "P10",
      "type": "synthetic ethical constraint",
      "facts": "Use anonymous supplied profiles, local mock-ups and no real orders, payments, account creation or personal data. Label every mock offer as fictional.",
      "interpretation_limit": "A classroom exercise does not establish legal or product certification."
    }
  ],
  "base": {
    "name": "Direct kit model",
    "price_per_delivered_unit": 48,
    "variable_cost_per_produced_unit": 28,
    "variable_cost_components": {
      "materials": 18,
      "assembly": 6,
      "packing": 4
    },
    "fixed_operating_cost": 900,
    "fixed_cost_components": {
      "defined_owner_compensation_allowance": 450,
      "space_and_equipment_allowance": 300,
      "administration_allowance": 150
    },
    "capacity_produced_units": 80,
    "available_production_hours": 40,
    "planning_minutes_per_produced_unit_including_packing": 30,
    "produced_units": 70,
    "delivered_units": 60,
    "paid_delivered_units_this_month": 50,
    "unpaid_delivered_units_due_next_month": 10,
    "closing_unsold_units": 10,
    "opening_cash": 400,
    "opening_receivables": 0,
    "opening_inventory_units": 0,
    "all_production_and_fixed_costs_paid_this_month": true,
    "cash_timeline": [
      {
        "day": 10,
        "receipt": 1200,
        "production_payment": 980,
        "fixed_payment": 450,
        "note": "35 kits made,30 delivered,25 paid. Receipts before same-day payments."
      },
      {
        "day": 24,
        "receipt": 1200,
        "production_payment": 980,
        "fixed_payment": 0,
        "note": "35 more kits made,30 delivered,25 paid."
      },
      {
        "day": 30,
        "receipt": 0,
        "production_payment": 0,
        "fixed_payment": 450,
        "note": "Remaining fixed cost paid."
      }
    ]
  },
  "alternative": {
    "name": "Immediate-payment pop-up",
    "price_per_delivered_unit": 44,
    "variable_cost_per_produced_unit": 29,
    "fixed_operating_cost": 1100,
    "capacity_produced_units": 80,
    "produced_units": 75,
    "delivered_units": 75,
    "paid_delivered_units_this_month": 75,
    "unpaid_delivered_units_due_next_month": 0,
    "closing_unsold_units": 0,
    "opening_cash": 400,
    "opening_receivables": 0,
    "opening_inventory_units": 0,
    "all_production_and_fixed_costs_paid_this_month": true,
    "cash_timeline": [
      {
        "day": 10,
        "receipt": 1100,
        "production_payment": 725,
        "fixed_payment": 550,
        "note": "25 kits made,delivered and paid. Receipts before same-day payments."
      },
      {
        "day": 20,
        "receipt": 1100,
        "production_payment": 725,
        "fixed_payment": 0,
        "note": "25 more made,delivered and paid."
      },
      {
        "day": 28,
        "receipt": 1100,
        "production_payment": 725,
        "fixed_payment": 0,
        "note": "25 more made,delivered and paid."
      },
      {
        "day": 30,
        "receipt": 0,
        "production_payment": 0,
        "fixed_payment": 550,
        "note": "Remaining fixed cost paid."
      }
    ],
    "constraint": "The pop-up replaces the direct model for the month; volumes and fixed costs are not added to the base case. No outside finance or additional labour is supplied."
  },
  "change_case": {
    "name": "Direct-model materials increase",
    "applies_to": "base",
    "changes": {
      "variable_cost_per_produced_unit": 32,
      "materials_component": 22
    },
    "unchanged": "CAD48 price, CAD900 fixed cost,70 produced,60 delivered,50 paid,80 production capacity,CAD400 opening cash; assemblyCAD6 and packingCAD4 per unit remain unchanged.",
    "cash_timeline": [
      {
        "day": 10,
        "receipt": 1200,
        "production_payment": 1120,
        "fixed_payment": 450,
        "note": "Same first-batch quantities; higher cost."
      },
      {
        "day": 24,
        "receipt": 1200,
        "production_payment": 1120,
        "fixed_payment": 0,
        "note": "Same second-batch quantities; higher cost."
      },
      {
        "day": 30,
        "receipt": 0,
        "production_payment": 0,
        "fixed_payment": 450,
        "note": "Remaining fixed cost paid."
      }
    ]
  },
  "test_material": {
    "prompt": "Using profiles K1–K6 and the supplied payer notes, compare the clearly priced kit with reuse/separate parts. Prepare an offer card, a response-record template and possible next actions. Do not invent new selections. Work through one mock batch and collection schedule using the supplied time and storage limits.",
    "required_outputs": [
      "Specific vulnerable business claim",
      "Scope and price of the fictional offer",
      "Choice and payer-authority evidence to seek",
      "Production/storage/collection balancing measure",
      "Conditional next action and stop condition",
      "What the simulation cannot establish"
    ]
  },
  "accounting_assumptions": [
    "Earn revenue on delivered kits. Cost of delivered units is delivered quantity times the supplied unit production cost.",
    "All production costs are paid in the month, including unsold kits. Unsold usable kits remain inventory at the stated unit cost; no spoilage, impairment or depreciation is included.",
    "There is no opening inventory or receivable. Unpaid delivered revenue is assumed collectible next month solely for this exercise.",
    "No tax, interest, capital purchase, borrowing, owner drawing, returns, discounts, delivery cost or other flows exist in the arithmetic.",
    "The defined owner compensation allowance is included once in fixed cost.",
    "Negative calculated cash is an unresolved funding gap, not an assumed overdraft. Daily receipt-before-payment sequencing is supplied, so the timeline can be inspected without inventing intraday credit.",
    "Capacity applies to production, while break-even applies to delivered units. With zero opening stock, delivered units cannot exceed produced units.",
    "The maximum-profit scenario assumes production and delivery both equal capacity, all units retain the same cost/price, and demand exists; it is not a forecast."
  ],
  "rights": "All narrative, profiles, records and numbers are original synthetic educational content for this candidate. No external quotations, third-party dataset, real testimonials, logos or market-representativeness claims are included."
}
